64
Measure relief valve
pressure
Oil
gauge
○
○
Pipe joint
Leakage,
loosen,
fracture,
deformation
and damage condition
○
○
○
○
Replace pipe
×
1
~
2years
Electrical system periodical maintenance schedule
Check
item
Service required
Tools
Daily
(8 hrs)
One and a
half
Monthly
(250hrs)
3months
(500hrs)
Semi-annual
(1000hrs)
Annual
(2000hrs)
Starting
motor
Pinion
engagement
condition
○
○
○
Battery
Electrolyte fluid level
and clean
○
○
○
○
Check
electrolyte
proportion
Areometer
○
○
○
Wire
Wire harness damage
and
fix
loosen
condition
○
○
○
○
Circuit joint looseness
condition
○
○
○
Steering
indicator
light
Work and installation
condition
○
○
○
○
○
Horn
Work and installation
condition
○
○
○
○
○
Light and
bulb
Work and installation
condition
○
○
○
○
○
Reversing
buzzer
Work and installation
condition
○
○
○
○
○
Instrument
Instrument
working
condition
○
○
○
○
○
Lifting system periodical maintenance schedule
Check
item
Service required
Tools
Daily
(8 hrs)
One and a
half
Monthly
(250hrs)
3months
(500hrs)
Semi-annual
(1000hrs)
Annual
(2000hrs)
Chain,
chain
wheel
Check chain tensity, if
transform, damage or
rust.
○
○
○
○
○
Add oil to the chain
○
○
○
○
Riveting
pin
and
looseness
○
○
○
○