Racking a Roof

When building walls, always apply panel at

far left first.  Position panel flush with top of

wall frame and nail in upper corners as

shown.  Rack wall square by moving lower

end of wall panel right or left until panel is

flush with framing along left edge and

secure with one nail in each lower corner.

Continue nailing as instructed.

YOU MAY NEED TO RACK YOUR

WALL PANELS AND ROOF PANELS

TO ENSURE SQUARENESS

BEFORE COMPLETELY NAILING.

Position panel flush with outside front edge
of rafter and nail in two corners as shown.
Rack panel square by moving opposite end
up or down until panel is flush along peak of
rafters and secure with one nail in each
corner.  Ensure spacing of center rafters and
nail as instructed.

IMPORTANT

!

Building Tip

Posicione los paneles nivelados con el borde
delantero exterior de la viga y clave en las dos
esquinas como en el dibujo.  Alinee escuadra
el panel por mover los extremos opuestos
arriba o abajo hasta que el panel esté
nivelado a lo largo del punto más alto de las
vigas, y fíjelo con un clavo en cada esquina.
Compruebe el espacio de las vigas centrales
y clave como indicado.

ES PRECISO ALINEAR LOS
PANELES DE LOS MUROS Y DEL
TECHO ANTES DE CLAVARLOS
COMPLETAMENTE PARA
ASEGURAR LA ESCUADRA.

Al construir los muros, siempre fije primero
el panel hasta la izquierda extrema.
Posicione el panel nivelado con la parte
superior de la estructura del muro y clávelo
en la esquina superior como en el dibujo.
Alinee nivelado el muro por mover el lado
inferior a la derecha o a la izquierda hasta
que el panel esté nivelado con la estructura
a lo largo del borde izquierda.  Fije con un
clavo en cada esquina inferior.

Alineando un techo

B

Nail / Clavo

Clou

Flush/ Al ras

À ras

Racking a Wall

Alineando un Muro

IL SE PEUT QUE VOUS DEVIEZ
ALIGNER VOS PANNEAUX DE
MUR ET DE TOIT POUR EN
ASSURER L’ÉQUERRAGE AVANT
DE CLOUER COMPLÈTEMENT.

Alignement d’un mur

Flush/ Al ras

À ras

Nail/ Clavo

Clou

Top Corner Should Be Flush.
La esquina superior debe estar
nivelado con la estructura.
L’angle supérieur doit être
affleurant.

Lors de la construction d’un mur, appliquez
toujours le panneau tout à fait à gauche en
premier.  Positionnez le panneau au ras du
sommet du cadre de mur et clouez les angles
supérieurs comme l’indique l’illustration.
Alignez le mur à l’équerre en déplaçant la partie
inférieure du panneau de mur vers la droite ou
vers la gauche jusqu’à ce que le panneau
affleure avec le cadre le long du bord gauche
et fixez avec un clou à chaque angle inférieur.
Continuez à clouer selon les instructions.

A

Alignement d’un toit

Nail / Clavo

Clou

Rack for squareness./
Nivele para escuadrar./
Aligner pour l’équerrage.

Flush with rafter peak./
Nivelado con la parte más
alta de las vigas./
Au ras du sommet du chevron.

Flush/ Al ras

À ras

Positionnez le panneau au ras du bord avant
extérieur du chevron et clouez deux angles
comme l’indique l’illustration. Alignez le
panneau à l’équerre en déplaçant l’extrémité
opposée vers le haut ou le bas jusqu’à ce que
le panneau affleure le long des sommets des
chevrons et fixez avec un clou à chaque angle.
Vérifiez l’espacement des chevrons centraux et
clouez selon les instructions.

Содержание 16702

Страница 1: ...9056 ou envoyez un courriel customerservice backyardproductsllc com Notre personnel est votre disposition pour vous offrir une assistance D avril octobre du lundi au vendredi de 8h00 19h00 heure de l...

Страница 2: ...This page intentionally left blank Esta p gina est intencionado en blanco Cette page est intentionnellement vierge...

Страница 3: ...e madera elaborada Nous fabriquons nos kits partir de bois de qualit construction et de produits en bois manufactur choisis Les caract ristiques et d fauts naturels du bois de construction peuvent com...

Страница 4: ...nea punteada representa una pieza no vista por ejemplo una pieza debajo de un panel Ayuda requerido Seleccione un sitio nivelado Ser necesario pedir ayuda para manejar unir y reforzar algunas piezas E...

Страница 5: ...le r elle NOTE NOTA REMARQUE RS RS RS Dos letras o tres letras de identificaci n est n marcadas horizontalmente en las piezas Letras de identificaci n de una sola letra no est n en las piezas Double a...

Страница 6: ...cm 8 x 9 8 5 8 244x296 cm LISTA DE PIEZAS 3 8 x1 3 4 x69 0 9x4x175 cm NY OZ LN TRIM MOLDURA x2 2 x3 x68 1 4 5x7 6x173 cm OO M x8 x2 x2 T x1 3 8 x6 x14 1x15x36 cm HJ 3 8 x48 x96 1x122x244 cm x1 J x1 H...

Страница 7: ...6 x 113 x 244 cm 5 8 x23 7 8 x48 1 6 x 61 x 122 cm P1 P2 P3 x1 x1 x2 2 5 0 cm x 24 7 16 x48 x84 1 x122x213 cm 2x4x89 1 2 227 cm Treated Wood Madera Conservada Bois trait 7 16 x48 x84 1 x122x213 cm 2x...

Страница 8: ...tro de la estructura Figuras B y C Siempre que instale el material deje el mejor borde y la mejor superficie a la vista Recuerde que estas imperfecciones no afectan de ninguna manera negativa la resis...

Страница 9: ...superior como en el dibujo Alinee nivelado el muro por mover el lado inferior a la derecha o a la izquierda hasta que el panel est nivelado con la estructura a lo largo del borde izquierda Fije con u...

Страница 10: ...ste equipo A B A B C Cut treated 2x4 sill plates to length Corte los tableros tratados 2x4 a longitud A B C 8 x 9 8 5 8 244 x 296 cm 96 244 cm 113 5 8 287 cm 8 x 9 8 5 8 244 x 296 cm 96 244 cm 116 5 8...

Страница 11: ...ejora a partir de la 24 en centro 61 cent metros a 12 en enmarcar de centro del piso de los 30 5 cm Esto te requiere agregar el material siguiente Qty del 4 de 2 x 4 x 89 1 2 5 x 10 x 227 cm trat Qty...

Страница 12: ...96 244 cm Nail Perimeter Clave el perimetro Clouer le p rim tre Nail Inside Panel Clave dentro del panel Clouer le panneau int rieur P1 P2 FRONT FRENTE AVANT 116 5 8 296 cm 96 244 cm 12 30 cm 6 15 cm...

Страница 13: ...11 2 5 cm x2 Nails Clavos Clous 2 5 cm x 2 PQ BACK WALL MURO POSTERIOR MUR ARRI RE...

Страница 14: ...12 3 4 1 9 cm 1 2 5 cm K L Temporary Support Apoyo no permanente Support temporaire BACK WALL MURO POSTERIOR MUR ARRI RE...

Страница 15: ...OZ 1 2 5 cm 1 2 5 cm Center Centro Centre LN 1 2 5 cm 1 2 5 cm 1 2 5 cm 1 2 5 cm 47 1 2 120 6 cm 47 1 2 120 6 cm 3 7 6 cm x 46 2 5 cm x 2 3 7 6 cm BACK WALL MURO POSTERIOR MUR ARRI RE Flush Al ras ra...

Страница 16: ...14 x 8 3 7 6 cm 9 23 cm NZ PS LG 37 7 8 96 cm 37 7 8 96 cm 45 1 2 115 5 cm 45 1 2 115 5 cm Center Centro Centre Marks Marcas Marques FRONT WALL MURO FRENTE MUR AVANT...

Страница 17: ...2 13 mm J H LG LG Align panel with marks Alinee las entrepa o de la marcas Alignez les panneaux avec les marques Temporary Support Apoyo no permanente Support temporaire FRONT WALL MURO FRENTE MUR AV...

Страница 18: ...16 OZ 1 2 5 cm 1 2 5 cm Center Centro Centre LG LG 3 7 6 cm x2 3 7 6 cm x2 2 5 cm x 42 3 7 6 cm x 4 1 2 5 cm 1 2 5 cm 1 2 5 cm 1 2 5 cm Flush Al ras ras FRONT WALL MURO FRENTE MUR AVANT...

Страница 19: ...17 1 1 4 3 2 cm x 12 Z Z Temporary Support Apoyo no permanente Support temporaire FRONT WALL MURO FRENTE MUR AVANT...

Страница 20: ...2 2 5 cm x 156 3 4 1 9 cm 1 11 16 4 3 cm 1 11 16 4 3 cm 1 11 16 4 3 cm 6 15 cm 12 30 cm Locate panel 3 4 1 9 cm down Localice entrepa o 3 4 1 9 cm hacia abajo Placez le panneau 3 4 po 1 9 cm au dessou...

Страница 21: ...cm 3 7 6 cm 3 7 6 cm WO ERECTING WALLS CONSTRUYENDO LOS MUROS MONTAGE DES MURS ERECTING WALLS CONSTRUYENDO LOS MUROS MONTAGE DES MURS Temporary Support Apoyo no permanente Support temporaire Centrez l...

Страница 22: ...s 3 SCREW TORNILLO 7 6 cm VIS 3 po 34 1 8 87 cm N x2 N M M ERECTING WALLS CONSTRUYENDO LOS MUROS MONTAGE DES MURS x4 ROOF TECHO TOIT Level Wall and Nail Nivele la pared y clave Mettez le mur niveau et...

Страница 23: ...21 x 40 x 40 x 24 22 1 4 56 5 cm 22 1 4 56 5 cm 24 61 cm 24 61 cm 24 61 cm 3 7 6 cm FRONT FRENTE AVANT ROOF TECHO TOIT...

Страница 24: ...22 x 40 x 40 3 7 6 cm x 16 x 40 x 40 3 7 6 cm x 2 VW VW x3 LOFT PAJAR MEZZANINE BACK WALL MURO POSTERIOR MUR ARRI RE LOFT PAJAR MEZZANINE...

Страница 25: ...istributed across loft La atenci n la Carga para no exceder 400 lbs 181 kg distribuy uniformemente a trav s del pajar LEVEL NIVEL NIVEAU WO ROOF TECHO TOIT LEVEL NIVEL NIVEAU Attention La charge ne do...

Страница 26: ...cm 1 2 5 cm G LN F x2 Center Centro Centre 2 5 cm 2 5 cm 6 15 cm 31 3 8 80 cm 31 3 8 80 cm 74 3 4 190 cm 2 5 cm 2 5 cm 2 5 cm 2 5 cm x 4 Z Strip Z Strip Z Strip Flush Al ras ras CUT CORTAR COUPER WAL...

Страница 27: ...Clouez ou bridez de fa on temporaire Use OO or other straight piece Utilice OO u otro pedazo recto Stagger Screws EscalonarTornillo Mettez les vis en quinconce NX x4 R p tez cette tape pour chaque c...

Страница 28: ...Temporarily nail or clamp Temporalmente clavo o sujeta Clouez ou bridez de fa on temporaire Use OO or other straight piece Utilice OO u otro pedazo recto Stagger Screws EscalonarTornillo Mettez les vi...

Страница 29: ...V x2 T x2 Q x2 Maintain truss dimension Mantenga las dimensiones del armaz n Conservez les dimensions des poutres 6 15 cm 12 30 5 cm ROOF TECHO TOIT Ver la p gina 7 para un consejo Voir un conseil de...

Страница 30: ...Int rieur de la porte Drill Taladro Percer 3 8 0 9 cm Hole Hoyo Trou 6 1 2 5 cm Screws Tornillos Vis 5 3 7 6 cm Screws Tornillos Vis 5 3 7 6 cm Screws Tornillos Vis 3 4 1 9 cm x6 x1 1 1 4 3 2 cm x 6...

Страница 31: ...29 36 91 cm x 40 2 5 cm x 14 3 4 19 mm Center Centro Centre Level Nivel Niveau A1 DI x2 EU x2 DOOR PUERTA PORTE 3 4 1 9 cm x7 x1 WINDOW FEN TRE VENTANA...

Страница 32: ...30 x 40 x 40 2 5 cm x 56 X x8 24 61 cm 24 61 cm 24 61 cm 24 61 cm 24 61 cm BATTENS LATTES LISTONES...

Страница 33: ...x 296 cm Drip Edge Snip bottom side of Drip Edge and Bend over to other side of Roof Corte la parte inferior del gotero y d blela sobre el otro lado del techo Side that hangs over side No Nails La par...

Страница 34: ...cm NAILS CLAVOS CLOUS Sealing Strip La tira que sella Bande d tanch it 1 2 5 cm 1 2 1 3 cm Shingles Needed Tejas Necesarias SHINGLES Not Included TEJAS No Incluidas 8 x 9 8 5 8 244 x 296 cm BARDEAUX...

Страница 35: ...nts No use rociadores cerca del edificio 5 1 8 13 cm 5 7 8 15 cm Pinte el edificio de nuevo cada dos a os MANTENIMENTO NECESARIO Apply pieces to ridge as shown Fije las piezas a la cumbrera como en el...

Страница 36: ...vertura y el entablado est n garantizados por dos a os 5 La covertura SmartSide est garantizada por 10 a os para los edificios Marco Series y por 15 a os para los edificios Premier Series 6 La covertu...

Страница 37: ...s et faces expos s de SmartSide ainsi que les bardages gaufr s pour inclure toutes les parois ext rieures et tous les c t s et bords de porte Pavillons pergolas et constructions en bois Pour valider...

Страница 38: ...36...

Страница 39: ...This page intentionally left blank Esta p gina est intencionado en blanco Cette page est intentionnellement vierge...

Страница 40: ...37...

Отзывы: