3
Monterey
Wooden Floor Kit
Concrete Slab Floor System
SITE PREPARATION
• Site must be properly leveled.
• Site should have natural drainage to
eliminate puddling under and around the
building.
• Site should be covered with plastic film
to discourage grass growth under the
building and to serve as a vapor barrier.
Before assembling your gazebo, you
must first construct a floor system. You
can:
A. Purchase our optional pre-cut Floor Kit.
Follow instructions included with optional
floor kit.
B. Purchase materials to cut and build
your own wooden floor.
NOTE: Our Precut Floor Kits have been
designed for normal residential use. It is
characteristic for the floor panels to
deflect (flex) during normal use. If you
intend to store very heavy objects in your
Gazebo, you may want to consider
adding floor joists to reduce the span.
OR
C. Install a 4” concrete slab floor system.
IF USING CONCRETE SLAB FLOOR
SYSTEM
• Construct 4” Concrete Slab Floor
System.
• Upon completion of above steps,
proceed to Step #2: Assembling Wall
Panels.
FLOOR SYSTEM
(Floor system not supplied with kit)
YOU MUST BUILD YOUR GAZEBO ON A FLOOR SYSTEM.
Содержание 16691
Страница 19: ...19 Monterey Notes...