background image

                                                                                                                                                     

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 
 
 
 
 
 
 
 
 
 
 
 

 

Model PT-10 & 12 FSS 

Fertilizer Spreader

 

SERIAL # __________________ 

 

WORK ORDER # ___________ 

 

Содержание PT-10 FSS

Страница 1: ...Model PT 10 12 FSS Fertilizer Spreader SERIAL __________________ WORK ORDER ___________...

Страница 2: ...y Decals Page S 6 Safety Decals Page S 7 PTO Shaft Adjustment and Maintenance How to Shorten the PTO Shaft Page P 1 Proper Lubrication Page P 2 Section 1 Basic Information PT 6 FSS PT 10 FSS Height an...

Страница 3: ...s Wheel Drive Parts List Page 3 3 Hydraulic Cylinder Engagement Assembly Page 3 4 Section 4 Flow Divider Flow Divider Parts Breakdown Page 4 1 Flow Divider Parts List Page 4 2 Section 5 Axle Assembly...

Страница 4: ...Data Recording Page 7 4 Spread Pattern Adjustment Data Recording Page 7 5 Spread Pattern Adjustment Data Recording and Driving Methods Page 7 6 Acceptable Spread Patterns Page 7 7 Spread Pattern Adju...

Страница 5: ...mpson Administrative Assistant Inside Sales Lisa Johnson Accounts Receivable Collections Michael Sosebee Sales Manager Gene Dye Outside Sales Mid South Regional Sales Manager Mike Gillum Outside Sales...

Страница 6: ...LL COST C Warranty Claim Forms Dealer Only a Warranty claim form forms will be supplied to Dealer upon request b Warranty claim forms are available in 2 part paper form or in an electronic format c Al...

Страница 7: ...ext Day Air will be the sole responsibility of the Customer Dealer H Parts Returns a All parts replaced under warranty will be returned to Chandler Equipment Company within 20 days of replacement for...

Страница 8: ...Company accepts no responsibility nor shall warrant any equipment or any component that is damaged due to any type Control System not sold and installed by Chandler Equipment Company K Items Not Cove...

Страница 9: ...Fertilizer and Lime Spreader Safety...

Страница 10: ...A safety label alerts you of potential hazards that can injure you or others Each safety label is preceded by a safety alert symbol and either the words DANGER WARNING or CAUTION DANGER Failure to fo...

Страница 11: ...ing parts when spreader is in operation 3 Check lug nuts daily 4 Maintain proper tire pressure according tire manufacturers specifications 5 If spreader becomes clogged turn off PTO Hydraulics before...

Страница 12: ...cals WARNING DO NOT ADJUST UNTIL SPINNERS STOP MOVING STAY OUT OF BOX WHILE CONVEYOR IS IN MOTION DO NOT RIDE ON SPREADER WHILE VEHICLE IS IN MOTION STAY CLEAR OF SPINNERS WHILE SPINNERS ARE IN MOTION...

Страница 13: ...S 4 PTO SAFETY DECAL...

Страница 14: ...S 5 LUG NUT DECAL MAXIMUM LOADED SPEED MAKE SURE TO CHECK LUG NUTS DAILY CAUTION WARNING DO NOT EXCEED 25 MPH...

Страница 15: ...S 6 HYDRAULIC SYSTEM DECAL...

Страница 16: ...S 7 ROTATING CHAIN WARNING ROTATING SPINNERS WARNING...

Страница 17: ...PTO Shaft Adjustment And Maintenance...

Страница 18: ...at this point without bottoming out no further action is necessary 2 If the driveline will not fit without bottoming out separate the driveline into two half shafts Mount the tractor half on the PTO a...

Страница 19: ...f the driveline and manually lubricate the telescoping tubes Check that all components are in good condition and properly lubricated before using the driveline Clean and re lubricate the driveline bef...

Страница 20: ...Section 1 Basic Information PT 6 FSS...

Страница 21: ...1 1...

Страница 22: ...1 2 Fertilizer 65 Lime 90 Hopper Capacity 56 Cubic Ft 56 Cubic Ft Payload 3 640 Lbs 4 000 Lbs CAUTION 2 TON MAXIMUM CAPACITY DO NOT OVERLOAD...

Страница 23: ...Section 2 PTO Drive Spinners...

Страница 24: ...2 1 A C B D C E F1 G C H I J I F2 L M N O S T C V P R C C PTO DRIVEN SPINNERS BASIC PARTS ILLUSTRATION DRIVELINE SHOWN W UNISHEILD TELESCOPING TYPE K Q W C...

Страница 25: ...1 1 4 SK Bushing 1100 2 199 2 B 11 0 SK Pulley 1000 PTO 1100 2 216 1 1 4 SK Bushing H 200 2 023 PTO Drive Line 1 1 4 Shaft Specify Length I 200 2 002 Universal Joint 7 8 Hex x 1 1 4 Round J 200 2 015...

Страница 26: ...er Disc Only S S R H V 300 1 208 Spacer Lock Collar for 1 1 4 Shaft W UCF 207 20 1 1 4 4 Bolt Flange Bearing 300 1 126 Front Belt Guard 540 PTO 300 1 126 Front Belt Guard 1000 PTO 300 1 127 Rear Belt...

Страница 27: ...2 4...

Страница 28: ...2 5...

Страница 29: ...135 1 S S Rod 25 Long B 300 1 136 Connecting Rod C 300 1 137 Manual Engagement Arm D 300 1 138 Top Cylinder Mount E 300 1 139 Lower Cylinder Brace F 300 1 140 Lower Cylinder Mount G 300 1 141 Engagem...

Страница 30: ...2 7...

Страница 31: ...Section 3 Full Press Wheel Drive Assembly...

Страница 32: ......

Страница 33: ...3 4...

Страница 34: ...3 5...

Страница 35: ...135 1 S S Rod 25 Long B 300 1 136 Connecting Rod C 300 1 137 Manual Engagement Arm D 300 1 138 Top Cylinder Mount E 300 1 139 Lower Cylinder Brace F 300 1 140 Lower Cylinder Mount G 300 1 141 Engagem...

Страница 36: ...Section 4 Flow Divider Assembly...

Страница 37: ......

Страница 38: ...Flow Divider Assembly S S Specify Floor Width When Ordering B 300 FT 011 Flow Divider Bar S S C UCFL 204 10 5 8 Flange Bearing D 300 FT 012 Flow Divider Adjustment Rod E 300 FT 013 Flow Divider Hex N...

Страница 39: ...Section 5 Axle Assembly...

Страница 40: ...104 C Spindle 800 2 115 D Hub Only 800 2 103 E Wheel Stud 800 2 118 F Wheel Nut 800 2 117 G Hub Cap 800 2 107 H Cotter Pin 800 2 102 I Slotted Nut 800 2 114 J Washer 800 2 116 K Outer Cone LM 67048 8...

Страница 41: ...2 C Spindle 800 3 111 D 8 Bolt Hub Only 800 3 101 E Wheel Stud 800 3 114 F Wheel Nut 800 3 113 G Hub Cap 800 3 103 H Cotter Pin 800 3 115 I Spindle Nut 800 3 109 J Washer 800 3 112 K Outer Cone LM 501...

Страница 42: ...800 3 114 125 140 Axle Bolt Pattern Tire Size Ply Wheel Size Air Pressure psi Tire Part Wheel Part Tire and Wheel Part 7000 6 12 5L x 15 8 15 x 10 LB 36 800 1 101 800 1 109 800 1 119 7000 6 14L x 16 1...

Страница 43: ...Section 6 Basic Set Up Operation...

Страница 44: ...desired rate of application 3 Adjust material divider accordingly 4 Engage Hydraulic Remote PTO control once engaged spinners should begin turning 5 Engage press wheel 6 Conduct a spread pattern pan...

Страница 45: ...ead pattern 2 Moving the Material Divider OUT will cause the spread pattern to be heavy on the outside of the spread swath 3 Moving the Material Divider IN will cause the spread pattern to be heavy in...

Страница 46: ...6 3...

Страница 47: ...Section 7 Maintenance Troubleshooting...

Страница 48: ...o check HYDRAULIC OIL level daily Located on the front of the oil tank is an oil temperature oil level gauge The oil level should be maintained within 1 inch of the black line at the top of the gauge...

Страница 49: ...ll times B Where excessive moisture exists it may be necessary to clean the material divider and spinners while in the field to achieve the best possible spread pattern C The material divider plays an...

Страница 50: ...Recommended Investigation A Basic Checks 1 Check to be sure indicator on flow control valve is located in its proper location Refer to spinner speed and spread pattern instructions 2 Check to be sure...

Страница 51: ...ating temperatures 2 Disengage PTO and install pressure gauge into CF port on flow control valve Refer to hydraulic flow control valve drawing page 3 7 3 Set lever on flow control valve on 10 4 Engage...

Страница 52: ...tight and properly in place D Check that the spinner discs are securely fastened Problem III Improper spread pattern Recommended Investigation A Check setting of material divider B Check spinner disc...

Страница 53: ...Section 8 Spread Pattern...

Страница 54: ...r while the machinery is in use or moving Wear eye protection and avoid discharge from spinners Do not ride on the spreader while in motion The spread pattern is affected by several factors including...

Страница 55: ...tween 650 and 750 rpm for ordinary materials Once the initial testing is completed testing should be repeated at the beginning of each spreading season anytime maintenance or adjustments are made to t...

Страница 56: ...of less than 2 degrees Place a plastic grid into each of the 21 collection pans Position the 21 pans on 6 centers with the long side parallel to the direction of travel If possible perform test when...

Страница 57: ...8 4 Data Recording...

Страница 58: ...8 5 Data Recording Unacceptable Pattern Acceptable Pattern...

Страница 59: ...mount of material applied is half of the amount at the center of the pattern The distance between these two points represents the optimal swath width If spreading blended fertilizer a visual inspectio...

Страница 60: ...8 7 Acceptable Pattern Using a 3 Pass Switchback Driving Method...

Страница 61: ...ve the material divider towards the front of the spreader 2 Increase spinner speed 3 Check spinner blade condition Light Outside the Tractor s Tracks 1 Check spinner blade condition 2 Decrease spinner...

Страница 62: ...8 9 Notes...

Отзывы: