6 - 1
Basic Operation of a Pull Type Spreader
1)
Make sure that PTO shaft and/or hydraulic hoses are connected properly.
2)
Raise gate for desired rate of application.
3)
Adjust material divider accordingly.
4)
Engage Hydraulic Remote/PTO control, once engaged, spinners should begin
turning.
5)
Engage press wheel.
6)
Conduct a spread pattern pan test, and make any required adjustments.
7)
You are now ready to spread.
8)
Use the following guidelines if any adjustments are necessary.
Содержание PT-10 FSS
Страница 1: ...Model PT 10 12 FSS Fertilizer Spreader SERIAL __________________ WORK ORDER ___________...
Страница 9: ...Fertilizer and Lime Spreader Safety...
Страница 13: ...S 4 PTO SAFETY DECAL...
Страница 14: ...S 5 LUG NUT DECAL MAXIMUM LOADED SPEED MAKE SURE TO CHECK LUG NUTS DAILY CAUTION WARNING DO NOT EXCEED 25 MPH...
Страница 15: ...S 6 HYDRAULIC SYSTEM DECAL...
Страница 16: ...S 7 ROTATING CHAIN WARNING ROTATING SPINNERS WARNING...
Страница 17: ...PTO Shaft Adjustment And Maintenance...
Страница 20: ...Section 1 Basic Information PT 6 FSS...
Страница 21: ...1 1...
Страница 23: ...Section 2 PTO Drive Spinners...
Страница 27: ...2 4...
Страница 28: ...2 5...
Страница 30: ...2 7...
Страница 31: ...Section 3 Full Press Wheel Drive Assembly...
Страница 32: ......
Страница 33: ...3 4...
Страница 34: ...3 5...
Страница 36: ...Section 4 Flow Divider Assembly...
Страница 37: ......
Страница 39: ...Section 5 Axle Assembly...
Страница 43: ...Section 6 Basic Set Up Operation...
Страница 46: ...6 3...
Страница 47: ...Section 7 Maintenance Troubleshooting...
Страница 53: ...Section 8 Spread Pattern...
Страница 57: ...8 4 Data Recording...
Страница 58: ...8 5 Data Recording Unacceptable Pattern Acceptable Pattern...
Страница 60: ...8 7 Acceptable Pattern Using a 3 Pass Switchback Driving Method...
Страница 62: ...8 9 Notes...