background image

 

 

  AI-118  operation manual

 

 

 

issue 1 19.10.07                 display version 07 . plc controller version 07 

            P.38 of 50

 

 

8.  Tensioner trigger monitoring, when the tape is feeding, the text will turn red. 

9.  Front blowing working status monitoring, the text of the front blowing text is red 

when working. 

10. Clamp working status monitoring. 

11. Go back to the previous page; the previous page is the “main function” page. 

12. Monitor the working status of cutter, you can test by pressing #7 on the main 

page, or by pressing the right foot pedal at tape end, the text will turn red. 

13. Monitor the position of the air gun. When the air gun is placed in the position of 

working, the text is red. When the air gun is in the original position, the text is 

white. 

14. Monitor the position status of the quill. When the upper roller is pressed down, the 

text is red. When the upper roller is lifted, the text is white. 

15. Monitor whether the nozzle is heating, and the text turns red when heating. 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Содержание AI-118

Страница 1: ...hk e service hh com hk t 852 24813068 f 852 24813727 Room 1117 11 F Asia Trade Centre 79 Lei Muk Road Kwai Chung N T Hong Kong AI 118 Hot Air Sealing Machine Operation Manual is powered by H H Asia Gr...

Страница 2: ...eam Sealing 13 Preparation for Installation 14 Operation Controls 16 Touch Screen Control 16 Main page 1 page introduction 17 Main page 2 page introduction 19 Main page 3 heating temperature 20 Main p...

Страница 3: ...sion 07 plc controller version 07 P 2 of 50 Memory 39 Maintenance 41 Foot pedal control 43 Preventative 44 Procedures for Replacing Parts 45 Appendix A Nozzle Air Flow Cross Reference Table 48 Appendi...

Страница 4: ...of 50 Precautions with regard to Safety Please observe these safety tips for safe efficient and injury free operation of your equipment By strictly following all instruction contained in this manual y...

Страница 5: ...AI 118 operation manual issue 1 19 10 07 display version 07 plc controller version 07 P 4 of 50...

Страница 6: ...AI 118 operation manual issue 1 19 10 07 display version 07 plc controller version 07 P 5 of 50 Name Plate Figure 1 Machine Name Plate...

Страница 7: ...market today Built on pure digital platform and designed for the professional users AI 118 incorporated many new features that makes seam sealing much easier than before Operators are recommended to...

Страница 8: ...n 3600 W Compressed Air 0 4 0 6 Mpa Air Consumption 100 L min Nozzle Temperature 50 800 C Positioning Speed 1 80 ft min Nozzle Width 22 mm standard other optional Upper Roller Width 25 4mm Lower Rolle...

Страница 9: ...ol for upper and lower press rollers a great help to reduce the stretch and crease of the work piece The nozzle has the action of swinging in place and then cutting back and forth to avoid uneven heat...

Страница 10: ...ames Front View 5 4 6 3 2 1 15 14 13 12 11 10 9 8 7 Figure 2 Front View 1 heater 2 lower pedestal 3 knee switch 4 adjustable floor stand 5 left foot pedal 6 right foot pedal 7 main power switch 8 roll...

Страница 11: ...rsion 07 P 10 of 50 12 key lock 13 touch screen control panel 14 heater power outlet 15 nozzle air intake connector Back View 4 3 2 1 7 6 5 Figure 3 Back View 1 Water filter 2 The main electrical box...

Страница 12: ...rsion 07 plc controller version 07 P 11 of 50 Cutter Assembly 1 2 3 4 5 6 7 Figure 4 Cutter Assembly 1 small tape clamping cylinder 2 the back blow hole 3 the front blow hole 4 cutter blade 5 presser...

Страница 13: ...rsion 07 plc controller version 07 P 12 of 50 Heater Component 1 1 2 3 4 Figure 5 Heater Component 1 1 swing cylinder 2 heater fixture 3 temperature sensor 4 safety cover Heater Component 2 1 2 Figure...

Страница 14: ...ot air is blowing out from the nozzle The hot air that actually reaches the surface of the tape is a mixture of hot air from the nozzle and the surrounding air from the proximity Hence the actual temp...

Страница 15: ...level and stable 3 Loosen all packing cable ties and materials in order to free up all machine movements 4 Connect the power plug to a suitable outlet with 220V 16A capacity 5 Locate the air hose sup...

Страница 16: ...achine is ready for operation now 9 Power on The touch screen panel will on and showing the program loading page After a while it will change to show the main control page Install tape Install the tap...

Страница 17: ...ters via the touch screen control panel only as a matter with a fingertip Most of the setting and time control parameters can input onto the panel and change to different pages for different settings...

Страница 18: ...on This button is used to adjust the position of nozzle After the wind nozzle position is adjusted you need to lift this button or else the machine cannot work Note This function can only be used when...

Страница 19: ...clamp cylinder used to adjust or wear the tape 9 Next page button Turn to main function page 10 Adjust the speed ratio between the upper and lower rollers to create a speed difference the speed of up...

Страница 20: ...ersion 07 P 19 of 50 Main page 2 page introduction 1 Figure 11 Main Page 2 1 An alarm will display when there is are any fault or beyond the parameter setting range After repairing the alarm click the...

Страница 21: ...splay button 2 Temperature input key pad 3 Enter temperature data 4 Cancel the setting 5 Confirm the setting Press button 1 can preset the nozzle temperature and then the key pad 2 for heat temperatur...

Страница 22: ...preset display button 2 Speed input key pad 3 Enter speed data 4 Cancel the setting 5 Confirm the setting Press button 2 can preset the speed of upper roller and then the key pad 1 for speed setting...

Страница 23: ...version page button press the icon to turn to page of program version page 4 Alarm page button press the icon to turn to the page of alarm setting 5 Tape start page button press the icon to turn to t...

Страница 24: ...2 Figure 15 Main Function Page 2 When the supervisor key is turned left pressing the 9 button in the main page figure 10 will turn to the main function page 2 but this page does not include monitor me...

Страница 25: ...anguage Press the 2 language icon on the main function page figure14 to enter the Language setting page 1 2 Figure 16 Language 1 Press this button to change language between English Simplified Chinese...

Страница 26: ...am Version page 1 2 4 3 Figure 17 Program Version 1 Display the length of the tape currently used 2 The number of repetitions every 100000 meter in metering will count one in repeat once counted the m...

Страница 27: ...at probe to the electronic board has a problem such as disconnection short circuit etc Reset the alarm when it was modified 2 Tensioner over limit If this item has problem it shows that the roller of...

Страница 28: ...st the pressure and you can reset the alarm 5 Heater not heating up There will be alarm when the heater cannot heat up If this item has problem please check if the heating pipe is in good condition an...

Страница 29: ...nozzle blows the tape upper roller rotates but lower roller doesn t after a certain time upper roller goes down then upper roller and lower roller rotate together The larger the value the longer the...

Страница 30: ...tape spool 6 Tape start blowing Set the time of tape start blowing The larger the value the lower the temperature of hot air affected to the part of start tape hence the tape may not fix well because...

Страница 31: ...ller already starts to rotate Hence the pause part may not fix well and leak because of no heating 2 Micro reverse speed After the pause during tape middle and before going on working machine will do...

Страница 32: ...tape end page 1 2 3 4 5 6 Figure 21 Tape End 1 After cut sealing speed The speed of the motor after the tape is cut Set the speed of the machine after cutting the tape This speed only refers to the s...

Страница 33: ...the value is too small the tape may be blown over 4 Blowing time When the front blowing function is turned on set the working time of blowing 5 Nozzle retract The time the nozzle stays after the tape...

Страница 34: ...ifully fit Off After pressing the right pedal and starting the cutting function the machine action is controlled by the operator The set parameters in the tape end part are all invalid except the jog...

Страница 35: ...er the countdown is finished the heater will be turned off automatically If you want to restart you need to start the heating tube according to the normal process Off When nozzle is heating it will no...

Страница 36: ...nd the tensioner will only move when the roller starts to rotate 9 Front blowing On The front blowing will work according to the parameter settings in tape start and tape end pages Off Turn off the fr...

Страница 37: ...off the setting of the fixed length mode will not work 2 A red dot indicates that the machine is performing a fixed length operation of mode 1 and which mode the red dot follows indicates which mode i...

Страница 38: ...onitor whether the right pedal is working 5 Knee switch monitoring 6 Supervisor control key monitoring when the key turns to the right the text is red when the key turns to the left the text is white...

Страница 39: ...n function page 12 Monitor the working status of cutter you can test by pressing 7 on the main page or by pressing the right foot pedal at tape end the text will turn red 13 Monitor the position of th...

Страница 40: ...he correct password and click Yes to enter the memory page 1 2 4 6 8 10 3 5 7 9 11 Figure 26 Memory Page 1 2 Figure 27 Example Diagram Page The memory page stores the operation data of several common...

Страница 41: ...odel of ST104 as shown in figure 27 1 above 6 Tape model ST306 operation data reading long press read for about 5 seconds after hearing the di sound the reading is successful 7 Schematic diagram about...

Страница 42: ...logged in at the memory page you can directly enter the maintenance page if you have not logged in at the memory page clicking the maintenance icon will pop up login tips like what at the memory part...

Страница 43: ...r from the nozzle and the surrounding air from the proximity Hence the actual temperature that reaches on the tape is lower than the original nozzle temperature At this time it is necessary to set the...

Страница 44: ...pper roller and start sealing To start sealing press forward To change the speed of sealing variable speed mode must be enable ease back slightly from the forward position The speed of sealing is prop...

Страница 45: ...ension if necessary Lubricate the cutter blade slightly with machine oil Wipe off any excessive oil if necessary While the machine is off and cooled test the circuit breaker by pressing the test butto...

Страница 46: ...ures for Replacing Parts Temperature sensor The tip of the replaced thermocouple is very important the location must be the same as shown in the below diagram Also inspect and make sure that the tip i...

Страница 47: ...ent Rollers The rollers are needed to be replaced when there are signs of torn or excessive worn in order to maintain the consistence of quality of the finished product Replace the rollers as shown in...

Страница 48: ...ction Check and secure the connection Faulty temperature controller Replace PCB in the main electrical box Thermocouple extension wire short circuit Find the location and fix Thermocouple not installe...

Страница 49: ...manual issue 1 19 10 07 display version 07 plc controller version 07 P 48 of 50 Appendix A Nozzle Air Flow Cross Reference Table Nozzle air pressure Mpa Air flow L min 0 05 35 0 06 38 0 07 40 0 08 42...

Страница 50: ...01 06S J KQ2L 6 02S J KQ2L 6 02S GR2008N 1 8 internal and external thread elbow roller pressure gauge CY3 CY2 CY1 SV1 SV2 SV3 cut tape cylinder cutter up down cylinder up down cylinder pressure tape...

Страница 51: ...d valve up down solenoid valve heater swing solenoid valve cutter solenoid valve pressure tape solenoid valve 1 2 3 4 5 6 J5 left foot pedal right foot pedal knee control switch 3 2 1 4 1 2 3 4 5 6 7...

Отзывы: