RC2-D Technical Manual
Thread Weld
Figure- Oil flow switch
5.2.17
Damping pad
In order to avoid the vibration and noise caused by the direct contact between the compressor and its
mounting foot and mounting base, it is recommended to install the damping pad at the position shown in
the figure below. The installation torque requirement is 20 ~ 30n · M.
No. A(mm) B(mm) C(mm) D(mm) E(mm)
Model
1
50
55
20
20
20
RC2-100~RC2-370
2
70
100
20
25
25
RC2-410~RC2-620
3
80
100
20
25
25
RC2-710~RC2-930
5.2.18
IP54 Terminal box
The terminal box reaches IP54 protection level. Please refer to the figure below to understand the
external dimension and internal dimension.
1)
RC2-100
~
180D-S(P) terminal box
Содержание RC2-D
Страница 27: ...RC2 D Technical Manual 2 RC2 200 470 D S P terminal box 3 RC2 510 930 D S P terminal box ...
Страница 44: ...RC2 D Technical Manual 46 10 Appearance Drawing 10 1 RC2 100 930D S Drawing RC2 100 140D S Drawing ...
Страница 45: ...RC2 D Technical Manual 47 RC2 180D S Drawing ...
Страница 46: ...RC2 D Technical Manual 48 RC2 200 620D S Horizontal suction port Drawing ...
Страница 48: ...RC2 D Technical Manual 50 RC2 620 930D S Vertical suction port Drawing ...
Страница 49: ...RC2 D Technical Manual 51 10 2 RC2 100 930D P Drawing RC2 100 140D P Drawing ...
Страница 50: ...RC2 D Technical Manual 52 RC2 180D P Drawing ...
Страница 51: ...RC2 D Technical Manual 53 RC2 200 620D P Drawing ...
Страница 53: ...RC2 D Technical Manual 55 RC2 620 930D P Drawing ...