6. Explanation of Drive Configuration
6.1 Preliminary Inspection
1) This drive is a product that satisfies most general operation conditions.
Verify the compatibility among supplied power, drive, and motor by inspecting
the specifications on the panel of device.
2) Confirm whether wiring is done as shown in the wiring diagram. Also, verify that
the conditions of terminal connection and the linkage of connecting parts are good.
3) Confirm that the phases of main power supply and control power supply are
the same ( L1=L1.1, L2=L2.1, L3=L3.1 ).
4) Confirm that the field power supply voltage (FL1, FL2) coincide with the field selection
voltage tab (FSL1, FSL2).
6.2 Reference Location Map of Selection Switch and trimmer
[Figure 5-1]
- 10 -