![Hamworthy S150 Скачать руководство пользователя страница 8](http://html2.mh-extra.com/html/hamworthy/s150/s150_installation-manual_3491071008.webp)
HAMWORTHY HEATING LTD
SHAFTESBURY SLIMLINE
500001129/A
2
2.0 SUPPLY AND DELIVERY
2.1 The boiler is normally supplied as a set of
equipment comprising the following:
a.
Cast Iron Sections mounted on pallets
b.
Accessory kit and tie rods
c.
Casing panels and insulation blankets
d.
Control panel
e.
Matched burner: fuel oil or gas
f.
Flue collector box
g.
Oil burner nozzle(s) - where applicable
Remove all packing material and inspect the
equipment to ensure that all parts are present and
undamaged.
If in any doubt, DO NOT USE THE EQUIPMENT.
Instead, contact HHL Technical Department.
Figure 2. 1 - Exploded View of Shaftesbury Slimline Heat Exchanger
Key to Figure 2.1 (above)
C2. Internal Nipples
VI. Cast Iron Front Section
WI. Cast Iron Intermediate Section(s)
XI. Cast Iron Rear Section
Key to Figure 3.1 (across page)
1.
Main Switch with on/off light
2.
Boiler thermometer
3.
Safety limit with manual reset (110
°
C)
4.
Screw for furnace pressure take-off, 10mm
dia.
5.
Burner opening: 130mm dia. standard.
6.
Opening drain cock: 3/4”
7.
Flame sight glass
8.
First step thermostat
9.
Second step thermostat
10.
Control system display.
11.
Run Timer
C2
VI
XI
WI
Содержание S150
Страница 6: ...HAMWORTHY HEATING LTD SHAFTESBURY SLIMLINE 500001129 A iv...
Страница 35: ...Notes...