HAMWORTHY HEATING LTD
SHAFTESBURY SLIMLINE
500001129/A
13
5.0 BOILER ASSEMBLY
5.2 - Assembly of Boiler Insulation.
5.2.1. Remove insulation from casing packaging and wrap around boiler body, taking care not to over-stretch the
insulating material as this may cause loss of heat. Secure insulation to body with straps supplied (marked A
below) in figure 5.2.1
5.2.2. Insulation securing tapes should be secured as shown in figure 5.2.2
Figure 5.2.1
Figure 5.2.2
Pull
Pull
Содержание S150
Страница 6: ...HAMWORTHY HEATING LTD SHAFTESBURY SLIMLINE 500001129 A iv...
Страница 35: ...Notes...