background image

 

HAMWORTHY HEATING LTD

 

 

QAA73.210 

 

Programmable Room Unit

 

 

500001305/B

 

 

27

 

8.0  Single  Heating  Circuit  with  Domestic  Hot 

Water

 

 

Description of system type

 

 

All  circuit  pumps  and  temperature  control  is 

achieved  via  the  boiler  with  the  QAA73  room 

controller.  Time  clock  and  climate  settings  are 

programmed  within  the  QAA73  room  controller  as 

part of the commissioning procedure.

 

 

The  boiler  controller,  LMU64,  will  set  the  primary 

temperature  according  to  the  highest  heat 

requirement,  ie,  if  the  D.H.W.  cylinder  requires  a 

higher  temperature  than  the  heating  circuit  the 

primary  temperature  will  be  set  to  this.  During  this 

period  the  heating  circuit  pump  will  be  switched  off 

to prevent overheating of the space.

 

 

Hardware required

 

 

1

 

Boiler 

incorporating 

LMU64 

boiler 

management unit.

 

2

 

Room  programmer  QAA73.  Programmable 

room  unit  kit  including  wiring  terminal  blocks  for 

boiler  LMU  wiring  connection,  part  number 

563605337.

 

3

 

External  air  sensor  QAC34.  Part  number 

533901457.

 

4

 

D.H.W.  Cylinder  sensor  QAZ21.  Sensor  kit 

including wiring terminal blocks for boiler LMU wiring 

connection  and  immersion  pocket,  part  number 

563605338.

 

 

Frost protection

 

 

The  building  is  protected  for  internal  temperature 

using  the  QAA73  room  programmer  temperature 

sensor.

 

 

The  boiler  is  internally  protected  for  water 

temperature using the LMU64 temperature sensors. 

Also the D.H.W. cylinder is protected via the signal 

received  from  the  cylinder  sensor.  Both  boiler  and 

hot  water  cylinder  frost  protection  settings  are  pre

-

programmed  in  the  boiler  controls,  not  the  QAA73 

programmable room unit.

 

 

Primary circuit pump

 

 

The  primary  circuit  pump  is  designated  Q8.  this 

must be connected to the boiler at terminals 

X2

-

03, 

Q8  primary  circuit  pump  contactor

’. 

The  control 

signal is  a start stop control that must be  wired via 

suitable  contactors  and  hand/auto  switches  for 

maintenance purposes.

 

 

Flow rate and resistance for the primary pump must 

be  sized  in  accordance  with  the  flow  requirements 

for  the  boiler  and  the  resistance  requirements  of 

both the boiler and the primary circuit.

 

 

Note: 

The control does not incorporate a facility for 

 

switching duty/standby pumps. If required this must 

be facilitated externally to these controls.

 

 

Heating circuit pump

 

 

The  heating  pump  is  designated  Q1.  This  must  be 

connected  to  the  boiler  at  terminals 

X2

-

02,  Q1 

heating circuit pump contactor

’. 

The control signal is 

a  start  stop  control  that  must  be  wired  via  suitable 

contactors and hand/auto switches for maintenance 

purposes.

 

 

Flow rate and resistance for the heating pump must 

be  sized  in  accordance  with  the  flow  requirements 

for  the  heating  circuit  and  the  resistance 

requirements of the heating circuit.

 

 

Note: The control does not incorporate a facility for 

switching duty/standby pumps. If required this must 

be facilitated externally to these controls.

 

 

D.H.W. Circuit pump

 

 

The  D.H.W.  circuit  pump  is  designated  Q3.  This 

must be connected to the boiler at terminals 

X2

-

04, 

Q3  DHW  cylinder  pump  contactor

’. 

The  control 

signal is  a start stop control that must be  wired via 

suitable  contactors  and  hand/auto  switches  for 

maintenance purposes.

 

 

Flow rate and resistance for the D.H.W. circuit pump 

must  be  sized  in  accordance  with  the  flow 

requirements  for  the  cylinder  and  the  resistance 

requirements of the cylinder and pipework circuit.

 

 

Note: The control does not incorporate a facility for 

switching duty/standby pumps. If required this must 

be facilitated externally to these controls.

 

 

Room programmer

 

 

The  single  room  programmer,  QAA73,  must  be 

installed  in  the  location  most  suitable  for  providing 

accurate space heating comfort control with the first 

heating  circuit  area  (circuit  using  pump  Q1).  This 

must  be  connected  to  the  boiler  at  terminals 

X10

-

01, room unit QAA73

’.

 

 

Wiring should be completed using a 1.5mm² twisted 

pair  shielded  cable  run  separately  to  any  mains 

cables to prevent electrical interference.

 

 

External air sensor

 

 

This must be installed on a North facing wall to 

prevent solar heating of the sensor and away from 

heat emitting items such as ventilation outlets. 

Connection is directly to the boiler at terminals 

X10

-

06, external air sensor QAC34

’. 

Wiring should be 

completed using a 1.5mm² twisted pair shielded 

cable, run separately to any mains cables to prevent 

electrical interference. For further details regarding 

the sensor specification and fitting requirements 

 

Содержание QAA73.210

Страница 1: ...Room Unit For Single Boiler Installations INSTALLATION COMMISSIONING AND SERVICING INSTRUCTIONS IMPORTANT NOTE THESE INSTRUCTIONS MUST BE READ AND UNDERSTOOD BEFORE INSTALLING COMMISSIONING OPERATING...

Страница 2: ......

Страница 3: ...210 PROGRAMMABLE ROOM UNIT For Single Boiler Applications Installation Commissioning and Operating Instructions i NOTE THESE INSTRUCTIONS SHOULD BE READ AND UNDERSTOOD BEFORE ATTEMPTING TO INSTALL CO...

Страница 4: ...sioning 5 4 0 Operation 10 4 1 Display 4 2 Programming BMU parameters 4 3 Room unit settings 4 4Time switch program 4 5 Cooling circuit 4 6 Domestic Hot Water 4 7 Configuration 4 8 Functions 5 0 Fault...

Страница 5: ...HAMWORTHY HEATING LTD QAA73 210 Programmable Room Unit 500001305 B iii...

Страница 6: ...HAMWORTHY HEATING LTD QAA73 210 Programmable Room Unit 500001305 B iv...

Страница 7: ...dual basis D h w program with up to 4 heating periods per day can be selected on an individual basis Holiday program The heating programs and the d h w program can be reset to their default settings P...

Страница 8: ...erature as accurately as possible without being affected by direct solar radiation or other heating or cooling sources Mounting height should be approximately 1 5 meters above the floor The unit can b...

Страница 9: ...t the bottom and remove the base from the housing front Pull the interface cable through the opening of the base and connect it to the screw terminals Fit the base to the walls with screws Engage the...

Страница 10: ...or the OpenTherm communication interface and the QAA73 room controller is supplied from the boiler LMU64 controller Cables used for installing the OpenTherm communication interface power supply must h...

Страница 11: ...cations and details regarding which parameters to change please refer to the relevant section of this manual Buttons Explanation 1 Press the Info button for at least 3 seconds This will take you direc...

Страница 12: ...ttons to select the required user level To confirm press OK You are now on the required user level User levels The user levels only allow authorized user groups to make settings To reach the required...

Страница 13: ...HAMWORTHY HEATING LTD QAA73 210 Programmable Room Unit 500001305 B 7 Overview of user Parameters Continued on next page...

Страница 14: ...Room Unit 500001305 B 8 Continued from previous page The above table shows all available settings up to the heating engineer level However certain operating lines may be hidden depending on the type...

Страница 15: ...HAMWORTHY HEATING LTD QAA73 210 Programmable Room Unit 500001305 B 9 4 0 Operation 7 2 4 1 5 3 6...

Страница 16: ...HAMWORTHY HEATING LTD QAA73 210 Programmable Room Unit 500001305 B 10 4 1 Display Please see the previous table for the descriptions of the individual display icons...

Страница 17: ...HAMWORTHY HEATING LTD QAA73 210 Programmable Room Unit 500001305 B 11...

Страница 18: ...HAMWORTHY HEATING LTD QAA73 210 Programmable Room Unit 500001305 B 12...

Страница 19: ...HAMWORTHY HEATING LTD QAA73 210 Programmable Room Unit 500001305 B 13...

Страница 20: ...HAMWORTHY HEATING LTD QAA73 210 Programmable Room Unit 500001305 B 4 2 Programming BMU Parameters 14...

Страница 21: ...apply This setting must be made before the switching times are entered For every day on which other switching times shall apply the pre selection of the individual day with subsequent entry of the swi...

Страница 22: ...re setpoint is active the rooms will be heated according to the adjustment made with the setpoint buttons The adjustment made with the buttons is only active in automatic and continuous operation The...

Страница 23: ...es the flow temperature setpoint based on the selected heating curve The result is a constant room temperature irrespective of outside temperature variations By changing the setting the slope of the h...

Страница 24: ...the summer winter changeover temperature a fixed switching differ ential is compared with the attenuated outside temperature Note This func tion only acts in automatic mode The 24 hour heating limit...

Страница 25: ...C KORR Constant for room influence TRx Actual value of the room temperature TRw Room temperature setpoint TRwk Room temperature setpoint readjusted As the example shows if the room temperature is 2 C...

Страница 26: ...must be enabled to act on the relevant heating circuits There may be no thermostatic radiator valves in the reference room If such valves are present they must be set to their fully open position Qui...

Страница 27: ...ential will become greater The pumps are switched on and off less often The room temperature varies within a wider band With pump heating circuits the amount of heat supplied is controlled by switchin...

Страница 28: ...ature setpoint COMFR During nominal operation the nominal d h w setpoint is maintained It is possible to use 2 different d h w temperature setpoints The temperature setpoint during normal d h w operat...

Страница 29: ...e next day when d h w is heated for the first time This function is possible only when d h w heating is released by the d h w heating program Dwelling time at legionella function setpoint L TIME The s...

Страница 30: ...om influence AMBON must be activated for the required heating circuits and in addition an outside sensor must be connected Room influence The room influence acts on the room temperature setpoint The d...

Страница 31: ...QAA73 210 Programmable Room Unit 500001305 B 4 8 4 Fix flow temperature setpoint The setpoint has to be set manually Note The room influence AMBON must be set to OFF and in addition no outside sensor...

Страница 32: ...e been correctly set Check wiring of outside sensor Has the Nominal room temperature setpoint with the Parallel displacement of the heating curve been calibrated based on the effective room temperatur...

Страница 33: ...porate a facility for switching duty standby pumps If required this must be facilitated externally to these controls Room programmer The single room programmer QAA73 must be installed in the location...

Страница 34: ...HAMWORTHY HEATING LTD QAA73 210 Programmable Room Unit 500001305 B 26...

Страница 35: ...not incorporate a facility for switching duty standby pumps If required this must be facilitated externally to these controls Heating circuit pump The heating pump is designated Q1 This must be connec...

Страница 36: ...o any mains cables to prevent electrical interference Note The cable supplied with the sensor may require extending Features available with this system 7 Day time clock with 4 periods each day for hea...

Страница 37: ...HAMWORTHY HEATING LTD QAA73 210 Programmable Room Unit 500001305 B 29...

Страница 38: ...for boiler LMU wiring connection zone water temperature sensor QAL36 and immersion pocket part number 563605339 Fitting second heating circuit clip in relay kit AGU2 500A109 The clip in relay is requ...

Страница 39: ...e requirements of the second heating circuit Note The control does not incorporate a facility for switching duty standby pumps If required this must be facilitated externally to these controls D H W C...

Страница 40: ...ter circuit Auto summer winter time change BST to GMT Holiday program Frost protection for building Frost protection for boiler Frost protection for hot water cylinder Reduced temperature night setbac...

Страница 41: ...HAMWORTHY HEATING LTD QAA73 210 Programmable Room Unit 500001305 B 33...

Страница 42: ...to illustration below For wall mounting a cable entry gland Pg 11 can be fitted to the bottom of the housing External Sensor QAC34 Type Ref Sensing Element Range C Tolerance K Time Constant min Weight...

Страница 43: ......

Страница 44: ...blin 12 Ireland tel 00 353 141 91919 fax 00 353 145 84806 email info hevac ie Scotland Sales Service McDowall Modular Services 2 Penson Road Queenslie Industrial Estate Glasgow G33 4AG tel 0141 336 87...

Отзывы: