HAMWORTHY HEATING LTD
3
FLEET W series
500001211/F
Figure 2.2 - Boiler Packaged Dimensions
Delivery Verification
When taking delivery please ensure that you have received the correct number of boilers and individual flue kits or
flue collector manifolds to fulfil your order. If any item is missing please contact our after sales service team.
Please provide details of your order such as order number and contract number as well as a detailed description
of the missing item.
Frame Set and Pipe work Header Kits
Where pipe work kits are supplied, these are packaged separately from the boilers. All ancillary items such as
isolation valves and boiler make-up connectors are factory fitted and tested The whole is shrink wrapped for security and
basic protection. Refer to Kit instructions for specific information.
Figure 2.3 - Single boiler arrangement showing frame, flue header, water pipework & low loss header
Model
H mm
W mm
D mm
Weight (kg)
F70W
1100
600
520
101
F85W
1100
600
520
116
F100W
1100
600
520
116
F40W
1100
600
520
90
F50W
1100
600
520
90
F60W
1100
600
520
101
F125W
1100
600
620
133
F150W
1100
600
620
145
Open flue with air
drawn from plant
room
Содержание FLEET Series
Страница 2: ......
Страница 37: ...HAMWORTHY HEATING LTD 31 FLEET W series 500001211 F Figure 8 2 1 3 Operation and display philosophy ...
Страница 46: ...HAMWORTHY HEATING LTD 40 FLEET W series 500001211 F Figure 8 3 11 Operating phases ...
Страница 79: ...Please complete the information on the Registration card cut out and return to Hamworthy Heating Ltd ...
Страница 80: ......
Страница 81: ......