![Hamworthy F175V Скачать руководство пользователя страница 8](http://html1.mh-extra.com/html/hamworthy/f175v/f175v_installation-commissioning-and-operating-instructions_3508249008.webp)
HAMWORTHY HEATING LTD
2
FLEET V series
500001217/D
2.0 SUPPLY AND DELIVERY
The boiler is despatched to site as a pre-assembled and tested unit. Each boiler is delivered by a tail lift vehicle
and lowered to ground level. It is the installers responsibility to convey the boiler to the plantroom.
NOTE
: The Fleet V series boilers
MUST
not be stacked. Once removed from the packaging, all boilers can be
manoeuvred on a standard pallet truck. However, when handling and manoeuvring the boiler care must be
taken to avoid damage to the casing. The flue system is packaged separately.
The boiler must be kept upright during handling.
The flue manifold connecting the vertical modules is supplied separately to the boiler - refer to Appendix C.
Warranty
Full warranty assistance will be covered when the appliance is commissioned by Hamworthy Heating Ltd, see
Terms & Conditions for full details.
Hamworthy Heating Ltd will not accept any liability resulting from damage due to tampering, improper
use, handling, installation errors, operation and maintenance. It is important to check for damage upon
receipt of product, which if found must be notified to Hamworthy Heating Ltd immediately.
In the event of failure or breakdown, isolate the equipment and contact Hamworthy Technical Support
Tel - 0845 450 2866
Figure 2.1 - Boiler Packaging
H
W
D
Содержание F175V
Страница 2: ......
Страница 31: ...HAMWORTHY HEATING LTD 25 FLEET V series 500001217 D Figure 8 2 1 3 Operation and display philosophy...
Страница 40: ...HAMWORTHY HEATING LTD 34 FLEET V series 500001217 D Figure 8 3 11 Operating phases...
Страница 63: ...HAMWORTHY HEATING LTD 57 FLEET V series 500001217 D NOTES...
Страница 66: ...HAMWORTHY HEATING LTD 60 FLEET V series 500001217 D...
Страница 67: ......