HAMPTON BAY Wood Insert HI200 Скачать руководство пользователя страница 11

HI200 Hampton Wood Cast Insert

11

1)

 Positive 

Flue 

 Connection 
 with 

Cleanout

2)

 Direct 

Flue 

 Connection 
 with 

Cleanout

3a)

 Full Flue Liner

 (No 

Cleanout

 Required)

Note:   A  clean-out door is sometimes 

required, by your inspector, to be 
installed when either the Positive fl ue 
connection or Direct fl ue connection 
method is used.  

The use of one of the connection methods listed 
on this page not only increases the safety of your 
insert by directing the hot gases up the fl ue, but 
will also help increase the unit's effi ciency and 
decrease creosote deposits in the chimney.

When a connected fl ue or liner is in use, the 
insert is able to “breathe” better by allowing a 
greater draft to be created.  The greater draft can 
decrease problems such as, diffi cult start-ups, 
smoking out the door, and dirty glass.

INSTALLATION INTO A

FACTORY BUILT 

FIREPLACE

1)

  When installed in a factory built fi replace, a 

full stainless steel rigid or fl exible fl ue liner 
is mandatory, for both safety and perform-
ance purposes.  When a fl ue or liner is in 
use, the insert is able to breathe better by 
allowing a greater draft to be created.  The 
greater draft can decrease problems such 
as, diffi cult start-ups, smoking out the door, 
and dirty glass.  

2)

  In order to position the fl ue liner, the exist-

ing rain cap must be removed from your 
chimney system. In most cases the fl ue 
damper should also be removed to allow 
passage of the liner.

3)

  In most cases opening the existing spark 

screens fully should give enough room for 
the insert installation. If it does not, remove 
and store.

When referencing installation or connec-
tion to masonry fi replaces or chimneys, the 
masonry construction must or shall be code 
complying.

INSTALLATION INTO A

MASONRY FIREPLACE

The insert must be installed as per the require-
ments of your local inspection authority.  Three 
methods of fl ue connection are acceptable in 
most areas, these include:

1)

 Positive fl ue connection, where a large 

blocking plate and a short connector pipe 
is used.

2)

 Direct fl ue connection, where a smaller 

blocking plate and a connector pipe to the 
fi rst fl ue liner tile is used.

3)

 Full 

fl ue liner, where a stainless steel rigid 

or fl exible liner pipe is routed from the insert 
outlet collar to the top of the chimney.

Hampton highly recommends the use of a full 
liner as the safest installation and provides the 
most optimum performance.  Your retailer should 
be able to help you decide which system would 
be the best for your application.

In Canada this fi replace insert must be 
installed with a continuous chimney liner 
of 5.5" or  6" diameter extending from the 
fi replace insert to the top of the chimney. 
The chimney liner must conform to the 
Class 3 requirements of CAN/ULC-S635 
or CAN/ULC-S640, Standard for Lining 
Systems for New Masonry Chimneys.

4)

 If the fl oor of your fi replace is below the 

level of the fi replace opening, adjust the 
insert's levelling bolts to accommodate the 
difference. When additional shimming is 
required, use non-combustible masonry or 
steel shims.

5) 

Measure approximately the alignment of the 
fl ue liner with the position of the smoke outlet 
hole on the insert to check for possible offset. 
If an offset is required, use the appropriate 
offset adaptor in your installation.

6)

  Once the above items have been checked, 

slide your insert into position after fi rst po-
sitioning and securing the fl ue liner to the 
offset adaptor. 

 

Attach the rod to the adaptor and slide the 
adaptor onto the unit as the unit is slid into 
position. Ensure a positive connection.

 

Secure the adaptor to the unit by using 2 
bolts, fl at washers, lock washers and one 
screw in the front.

 

Re-install raincap at completion of installa-
tion.

INSTALLATION

Installer:

  Please record unit serial number here before installing blower.

Serial No.______________________________

Содержание Wood Insert HI200

Страница 1: ...da V4G 1H4 918 739b HI200 Wood Cast Insert 07 19 11 Owner s Installation Manual Tested by Installer Please complete the details on the back cover and leave this manual with the homeowner Homeowner Ple...

Страница 2: ...MPTON DEALER in your area Keep those HAMPTON FIRES burning SAFETY NOTE If this Insert is not properly installed a house fire may result For your safety follow the installation instructions contact loc...

Страница 3: ...ace 11 Installation Into a Masonry Fireplace 11 Fan Cast Faceplate Installation 12 Brick Flue Baffle Secondary Air Tube Installation 14 Firebrick Assembly 14 Draft Control 14 First Fire 15 Fan Operati...

Страница 4: ...PROTECTION AGENCY CERTIFIED TO COMPLY WITH JULY 1990 PARTICULATE EMISSION STANDARDS JAN FEB MAR APR MAY JUN JUL AUG SEPT OCT NOV DEC 2011 2012 2013 Duplicate Serial MADE IN CANADA 339 DATE OF MANUFAC...

Страница 5: ...nsert use these dimensions to en sure appropriate clearances will be met refer to Masonry and Factory Built Fireplace Clearances section UNIT DIMENSIONS WITH STANDARD FLUE ADAPTOR 6 152mm Diameter STA...

Страница 6: ...9 9 16 4 9 16 15 1 16 6 3 8 14 1 8 25 NOTE BeforeassemblingyourInsert use these dimensions to en sure appropriate clearances will be met refer to Masonry and Factory Built Fireplace Clearances section...

Страница 7: ...lling and using your fireplace insert Install and use only in accordance with manufacturer s installation and operating instructions 2 Check your local building codes Build ing Inspection Department Y...

Страница 8: ...ial with a K factor of 0 84 The proposed alternative is 4 100mm brick with a C factor of 1 25 over 1 8 3mm mineral board with a K factor of 0 29 Step a Use formula above to convert specification to R...

Страница 9: ...daptor using 3 screws 1 in the front and 1 each on the left and right side Flex Liner Diagram 1 Your insert is very heavy and will require two or three people to move it into position 1 Remove the Doo...

Страница 10: ...wn in diagram 4 While sliding the unit into place pull on the rod to ensure that the flue adaptor is properly engaged See diagram 5 Pull Rod 10 Ensure that the unit is still level 11 To complete the i...

Страница 11: ...spection authority Three methods of flue connection are acceptable in most areas these include 1 Positive flue connection where a large blocking plate and a short connector pipe is used 2 Direct flue...

Страница 12: ...unting Bracket Mounting Bracket Gasket Gasket 2 Slide the unit into position leaving partially out to allow for installation of the left and right side surrounds 3 Install the left and right side surr...

Страница 13: ...g temperature or at least 30 minutes after starting fire 8 Surround adjustments can be made up or down loosen 4 bolts shown on face of unit Diagram 7 and adjust Surround can also be adjusted left or r...

Страница 14: ...talltheairtubeintotheholesinthe side channels The notch goes on the right hand side with the air holes facing toward the door Slide the tube into the left hand side asfaraspossibleandthenbringitback i...

Страница 15: ...nced during the heating up process Thesenoiseswillbeminimalwhenyourunit reaches temperature 12 Before opening your door to reload open draftfullyforapproximately10to15seconds until fire has been re es...

Страница 16: ...of by burial in soil or otherwise locally dispersed they should be retained in the closedcontaineruntilallcindershavethoroughly cooled Other waste should not be placed in the ash container SOME SAFETY...

Страница 17: ...ure that the glass gasketing will properly seal your unit 5 Re install the glass retainer Ensure that it rests on the gasket and not the glass 6 Secure glass retainer using the 4 screws Do not wrench...

Страница 18: ...justment as the door gasket material com presses over time Removal of spacers will allow the latch to be moved closer to the door frame causing a tighter seal 1 Remove the Latch Assembly from the unit...

Страница 19: ...ch by undoing the inner 2 bolts Adjust to desired location and retighten the 2 bolts make sure the door catch closes freely and makes a good seal Do a paper test to confirm seal Latch Assembly Latch A...

Страница 20: ...Density Door Gasket Kit 20 210 911 Fan Blower Assembly Metallic Black 210 915 Fan Blower Assembly Timberline Brown 910 157 P Blower Fan Motor 910 684 Power Cord 120 Volts 910 142 Fan Thermodisc 910 14...

Страница 21: ...ast Insert 21 CAST FACEPLATE Part Description 210 921 Metallic Black Faceplate 210 925 Timberline Brown Faceplate 1 Top Surround 2 Left Side Surround 3 Right Side Faceplate Not available as a replacem...

Страница 22: ...t Description 170 960 Complete Brick Set 70 Brick Regular Full Size 1 1 4 x 4 1 2 x 9 76 Brick Partial 1 1 4 x 2 x 9 81 Brick Partial 1 1 4 x 1 1 4 x 9 84 Brick Partial 1 1 4 x 4 1 2 x 8 85 Brick Part...

Страница 23: ...days of installation Reported damage after this time will be subject to rejection Any part or parts of this unit which in our judgement show evidence of such defects will be repaired or replaced at FP...

Страница 24: ...__________________ Phone ___________________________________________________________ Date Installed ______________________________________________________ Serial No ___________________________________...

Отзывы: