background image

3

Pre-Installation

TOOLS REQUIRED

HARDWARE INCLUDED

NOTE:

 Hardware not shown to actual size.

Part Description 

Quantity

 AA 

Fixture 

1

 BB 

Mounting  Plate 

1

 CC 

Junction Box Screws 

2

 DD 

Washers 

2

 EE 

Decorative  Nuts 

2

AA

BB

CC

DD

EE

Содержание LAN15/3WY/BLK/HD

Страница 1: ...iday 9 a m 6 p m EST Saturday 1 855 HD HAMPTON HAMPTONBAY COM THANK YOU We strive to continually create quality products designed to enhance your home Visit us online to see our full line of products...

Страница 2: ...ept any interference received including interference that may cause undesired operation Note This equipment has been tested and found to comply with the limits for a Class B digital device pursuant to...

Страница 3: ...lation TOOLS REQUIRED HARDWARE INCLUDED NOTE Hardware not shown to actual size Part Description Quantity AA Fixture 1 BB Mounting Plate 1 CC Junction Box Screws 2 DD Washers 2 EE Decorative Nuts 2 AA...

Страница 4: ...alling the mounting plate Attach the Mounting Plate BB to the outlet box using the provided Junction Box Screws CC Make sure to run the house wires through the center hole on the Mounting Plate BB 4 C...

Страница 5: ...e top holes on the terminal block Make sure the screws on the Mounting Plate BB are also aligned Push the fixture back plate to the Mounting Plate BB Make sure that the threaded screw ends are coming...

Страница 6: ...from FL SW with your existing light switch To change color temperatures using your existing light switch Set the slide switch on the back of the fixture to SWITCH Toggle your light switch ON and OFF...

Страница 7: ...oblems missing parts Before returning to the store call Hampton Bay Customer Service 8 a m 7 p m EST Monday Friday 9 a m 6 p m EST Saturday 1 855 HD HAMPTON HAMPTONBAY COM READ AND FOLLOW ALL SAFETY I...

Отзывы: