P.D.I. (Post Delivery Inspection and assembly)
a)
Install RR. Shocks and tighten the nuts.
b)
Install Ball Head, Tie Rod, tighten the Castle Nut and insert the cotter Pin.
c)
Install Dust Seals, align the Ball Head Bolt, Knuckle Support to the square hole on the
Lower A-Arm.
d)
Install Flange Nut and tighten it (> 88.9 foot lbs).
e)
Install Front Tires and tighten the nuts.
f)
Install Rear Tires, tighten the nuts, insert cotter Pin and put on the Rubber Cover.
g)
Raise the C.B.C. bar as the picture shows.
h)
Install C.B.C. bar RR., put on R-Washer.
i)
Install Head-Rest.
j)
Check all nuts and bolts, wiring, cables, fuel line, switches and tire pressure.
k)
Fill battery with Acid and charge, check and fill the engine with the recommended oil.
l)
Fill fuel tank with Unleaded Gasoline, and turn on the ignition switch to start the engine.
Содержание UM250IIR 2005
Страница 1: ......
Страница 2: ......
Страница 18: ...Operation Component locations Figure 2...
Страница 25: ...Figure 13...
Страница 27: ...WIRING DIAGRAM...
Страница 29: ...Fig 2 CYLINDER COVER ASSY 1...
Страница 31: ...Fig 3 CYLINDER COVER ASSY 2...
Страница 33: ...Fig 4 CRANKCASE ASSY...
Страница 35: ...Fig 5 Right Side Cover Assy...
Страница 49: ...Fig 18 FRAME GROUP...
Страница 51: ...Fig 19 STEERING SHAFT ASSY...
Страница 53: ...Fig 20 FRONT SUSPENSION ARM ASSY...
Страница 55: ...Fig 21 FULL SHIFTING ASSY...
Страница 57: ...REAR CARGO RACK SEAT BELT Fig 22...
Страница 59: ...FIG 23 AIR CLEANER RADIATOR BATTERY MUFFLER ASSY...
Страница 61: ...FIG 24 GEAR BOX ASSY...
Страница 63: ...FIG 25 REAR SUSPENSION ASSY...
Страница 65: ...WIRE HARNESS ELECTRICAL...