Page 3
1000001732 (Rev. D - 06/16)
HAC-HB*1B HAC-HB-NF-*1B
4) Remove Bubbler Water Line
• Disconnect water line from bubbler.
Remove Bubbler Water Line
5) Lift and Remove Basin.
• Remove basin assembly by lifting straight
up, disconnecting the drain line from the
P-trap.
Lift and Remove Basin.
Exchange Drain hardware.
6) Assemble Drain hardware.
• Remove drain hardware from original
basin.
• Remove the protective covering from the
basin.
• Reinstall the drain elbow, drain plug, and
strainer plate on to the new basin
• Attach the new drain hardware onto the new
basin.
Exchange Bubbler hardware.
WATER COOLER PREPARATION
7) Exchange Bubbler hardware.
• Remove bubbler hardware from original basin.
• Reinstall the bubbler hardware on to the new
basin.
• Ensure the bubbler is properly positioned
with the stream falling onto the center of
splash ridge.
Buy at
| 855-558-9600 | BottleFillingStations.com