background image

B400 R (7190)

3

Maintenance certificate

Maintenance certificate

Handover

Equipment
Trial run
Handover to customer
Instruction
performed on:

at _______________ operating hours

Hako system maintenance I

250 operating hours

Workshop stamp

performed on:

at _______________ operating hours

Hako system maintenance II

500 operating hours

Workshop stamp

performed on:

at _______________ operating hours

Hako system maintenance I

750 operating hours

Workshop stamp

performed on:

at _______________ operating hours

Hako system maintenance S

1000 operating hours

Workshop stamp

performed on:

at _______________ operating hours

Hako system maintenance I

1250 operating hours

Workshop stamp

performed on:

at _______________ operating hours

Hako system maintenance II

1500 operating hours

Workshop stamp

performed on:

at _______________ operating hours

Hako system maintenance I

1750 operating hours

Workshop stamp

performed on:

at _______________ operating hours

Hako system maintenance S

2000 operating hours

Workshop stamp

performed on:

at _______________ operating hours

Hako system maintenance I

2250 operating hours

Workshop stamp

performed on:

at _______________ operating hours

Hako system maintenance II

2500 operating hours

Workshop stamp

performed on:

at _______________ operating hours

Hako system maintenance I

2750 operating hours

Workshop stamp

performed on:

at _______________ operating hours

Hako system maintenance S

3000 operating hours

Workshop stamp

performed on:

at _______________ operating hours

Hako system maintenance I

3250 operating hours

Workshop stamp

performed on:

at _______________ operating hours

Hako system maintenance II

3500 operating hours

Workshop stamp

performed on:

at _______________ operating hours

Содержание Scrubmaster B400 R

Страница 1: ...Scrubmaster B400 R RM RH 7190 Service booklet Part number 88 10 3256 Valid as from 03 2021...

Страница 2: ...ised Hako workshop by reference to the machine specific system maintenance Hako system maintenance II every 500 hours Performance by an expert of an authorised Hako workshop by reference to the machin...

Страница 3: ...ating hours Workshop stamp performed on at _______________ operating hours Hako system maintenance I 1750 operating hours Workshop stamp performed on at _______________ operating hours Hako system mai...

Страница 4: ...controllers drive control power relays fuses power distributors Steering and brake Check the steering for stiffness Check bearing clearance of the pinion and the universal joints Check the steering p...

Страница 5: ...flex wall for damage Check the fresh water level indicator calibrate if necessary Check leak tightness and proper functioning of the drain hoses fresh and waste water replace if necessary Check the c...

Страница 6: ...necessary Check proper functioning of the coarse dirt flap lock only B400 RH High pressure cleaner One off oil change For oil see annex Engine Vehicle fluids Spray the following locations on the mach...

Страница 7: ...he sweeping roller motors and check the carbon brushes for ease of movement and wear replace carbon brushes if necessary at the latest after 2000 operating hours Change the V belt in the pre sweep suc...

Страница 8: ...Hako GmbH Head Office Hamburger Str 209 239 23843 Bad Oldesloe Germany Tel 49 4531 806 0 info hako com www hako com...

Отзывы: