Sheet 61
7. Mechanical components
Height adjustment
The height adjustment (X) of the supporting rollers Fig. 7.4 (A) has been set to 3 mm in the factory.
If striping still occurs despite optimum inclination adjustment, set the distance of the supporting
rollers to the lower edge of the sealing strip by adjusting the number of washers under the
supporting roller holder.
7.1 Squeegee
Figure 7.3
Содержание Scrubmaster B 120 R
Страница 20: ...Sheet 20 2 2 1 Switching off vacuuming dirt water tank full P T S...
Страница 30: ...Sheet 30 3 Technical data...
Страница 31: ...Sheet 31 3 Technical data...
Страница 32: ...Sheet 32 3 Technical data...
Страница 33: ...Sheet 33 3 Technical data...
Страница 34: ...Sheet 34 3 Technical data...
Страница 38: ...Sheet 38 4 2 Hako system maintenance I...
Страница 53: ...6 Machine settings 6 1 6 Charging characteristics of the integrated charger Sheet 53...
Страница 60: ...Sheet 60 7 Mechanical components 7 1 Squeegee Fig 7 2a Fig 7 2b...
Страница 62: ...Sheet 62 7 Mechanical components Height adjustment 7 1 Squeegee Figure 7 4...
Страница 84: ...Sheet 84 10 1 Service alarm clock 3 3 1 1 The service alarm clock is set via the Hako diagnostics system...
Страница 85: ...Sheet 85 11 Battery charger 11 1 Operating manual...
Страница 86: ...Sheet 86 11 Battery charger 11 1 Operating manual...
Страница 87: ...Sheet 87 11 Battery charger 11 1 Operating manual...
Страница 88: ...Sheet 88 11 Battery charger 11 1 Operating manual...
Страница 90: ...11 Battery charger 11 3 Charge data table Sheet 90...
Страница 97: ...Sheet 97 14 Notes...
Страница 98: ...Sheet 98 14 Notes...
Страница 99: ...Sheet 99 14 Notes...