2
1. Operation of V7 Main Menu
2-7
M
MJ1/2: RS-232C Signal Test
Turn the [MJ1] (or [MJ2]) and [RS232C] switches on.
•
RS-232C Self-loop Test
Check the signals [SD] and [RD]. Connect the data transfer cable (V6-CP) to CN1 for
the test.
1. Set the adaptor ADP25-9 (attached to V6-CP) to the cable V6-CP. Connect the
modular jack side of the cable to MJ1 (or MJ2) and the ADP25-9 side to CN1.
2. Press the [Self-Loop Test] switch. When the [OK] lamp lights up, the test is
successfully completed.
* If the [NG] lamp lights up, consult your local distributor.
MJ1/2: RS-485 Signal Test
If you would like to perform MJ1/2 RS-485 signal test, consult your local distributor.
CN1
RS232C
MJ1
RS485
MJ2
Communication Port
CN1
MJ1/2
V6-CP
ADP25-9
Self-Loop Test
CTS
RTS
NG
OK
Self-Loop Test
CTS
RTS
NG
OK
Содержание Monitouch V7
Страница 1: ...V7...
Страница 3: ......
Страница 17: ......
Страница 57: ......
Страница 95: ...2 38 3 Errors Displayed on the V7 Series Please use this page freely...
Страница 97: ......
Страница 150: ...1 Ethernet 2 FL net OPCN 2 3 MELSECNET 10 4 CC Link 5 OPCN 1 6 T LINK 7 PROFIBUS DP Network Communications...
Страница 151: ......
Страница 207: ......
Страница 343: ...5 136 29 Automationdirect PLC Please use this page freely...