
3
2. Power Supply Cable Connection
3-3
Ins
tal
•
Be sure to attach the terminal cover to the terminal block.
Notes on Usage of 100-240 VAC Specifications
•
Generally, an isolating transformer improves noise resistance. However, if the display unit is far
away from the secondary port of the transformer and noise gets mixed in, an isolating transformer
becomes unnecessary.
•
If any power voltage fluctuation caused by noise is expected, it is recommended that a voltage
stabilizer (effective in noise resistance) be used.
Grounding
•
An independent earth pole must be used for MONITOUCH.
•
Use a cable which has a nominal cross section of more than
2 mm
2
for grounding.
•
Set the grounding point near the MONITOUCH to shorten the
distance of grounding cables.
* When the V7 unit is attached to the mounting panel, the
fixtures and frame grounds (FG) are connected. To
detach the FG terminal from the ground, attach the
insulating sheet to the fixtures and the mounting panel for
insulation.
- For V708/V708i:
Attach the terminal cover (supplied)
to the terminal block.
- For V710/V710i/V712/V712i:
When closing the terminal cover, hold one
end of the cover as shown below.
Terminal cover
Press either end.
Power supply
Insulation transformer or
Stabilized transformer
To V710/V710i/V712/V712i
1.25 mm
2
Twist the cables.
CAUTION
Be sure to establish a ground of MONITOUCH.
(The level of grounding resistance should be less than 100
Ω
.)
V7 unit
Other
equipment
Содержание Monitouch V7
Страница 1: ...V7 Series...
Страница 3: ......
Страница 5: ......
Страница 9: ......
Страница 13: ......
Страница 14: ...11 Features 2 Models and Peripheral Equipment 3 System Composition Overview...
Страница 15: ......
Страница 25: ......
Страница 47: ...2 22 8 Printer Connection PRINTER Please use this page freely...
Страница 48: ...31 Mounting Procedure 2 Power Supply Cable Connection Installation...
Страница 49: ......
Страница 53: ...3 4 2 Power Supply Cable Connection Please use this page freely...
Страница 54: ...41 Coin type Lithium Battery 2 DIP Switch Setting 3 Function Switches Instructions...
Страница 55: ......
Страница 63: ......
Страница 81: ...5 18 10 Other Networks Please use this page freely...
Страница 82: ...61 Operational Procedures 2 Main Menu Screen MONITOUCH Operations...
Страница 83: ......
Страница 112: ...71 Error Messages 2 Troubleshooting Error Correction...
Страница 113: ......
Страница 122: ...81 Inspection and Maintenance 2 Warranty Policy Inspection and Maintenance...
Страница 123: ......
Страница 127: ...8 4 2 Warranty Policy Please use this page freely...