background image

Always swing the lifter into the transport position
before moving the machine.

Service

Lubricate the joints every 100 hours of operation.

Swinging the lifter into the
 transport position

3. Place the pipe on the lower frame of the 
    lifter in the lug on the lower frame of the machine.

4. Attach the lifter to the lug with the bolt and
    fix with the nut.

2. Raise the log onto the machine using the lifter. 
    During lifting, always make sure that the rising log can 
    neither hit you nor damage the machine.

Operation of the lifter

1. Roll the log 
    onto the lifter.

Occasional transfer of the machine with the lifter

WARNING! The distance must not be 
more than a few metres. Carry out the 
transfer at low speed, exercising particular 
caution.

Preparations before the transfer

1. Raise the lifting beams.

2. Remove the cotter and pin from the beam
    which is closest to the operator.

3. Pull out the beam extension onto the top of the infeed conveyor, 
    align the hole in the lifting beam with the hole in the extension and 
    put the pin through both these holes.

1. Raise the lifting beams 
    to the upper position.

2. Swing the lifter behind 
    the machine.

Отзывы: