n
The welded joints on the floor grate should be visually checked. If cracks are detected, the
components must be replaced.
n
Check the mechanical and electrical function of all system components and inspect them for
damage and corrosion.
If any defects are detected, the system component must be repaired or replaced.
Interval
Maintenance work
Personnel
yearly
Visual check of all screw connections
Qualified person
Check of all screw connections for correct torque
Qualified person
The correct torques are listed on page 73 of the original operating instructions.
DANGER!
Danger of electrical shock!
The switch cabinet heater is also activated with the main switch turned off.
Many areas of the control unit continue to carry voltage even with the main
switch turned off. Never perform work on the control unit if it is under voltage.
Switch off the voltage supply to the service lift in the wind energy installation if
necessary.
Interval
Maintenance work
Personnel
Every 2 years
Functional test of the switch cabinet heater
Electrician
Functional test of the heater of the arrester device
Electrician
Check of the red and green indicator lights on the front of the switch cabinet
Electrician
Check and, if necessary, adjustment of the correct temperature default according to the circuit diagram.
Electrician
Functioning of the shutter door lock
Qualified person
Additional “Cabin” inspection and maintenance plan
Additional “Switch cabinet” inspection and maintenance
plan
Maintenance
• TOPlift CCV •
13
Содержание TOPlift CCV
Страница 14: ......
Страница 15: ...1 1 en_GB Subject to technical changes Art Nummer 1147609...