background image

Page  19

31-5000727   Rev. 0

Joint Cementing Procedure

All  cementing  of  joints  should  be  done  according  to  the 

specifications outlined in ASTM D 2855.

DANGER OF EXPLOSION!

Fumes from PVC glue may ignite during system check. 

Allow fumes to dissipate for at least 5 minutes before 

placing unit into operation.

 DANGER

1. 

Measure and cut vent pipe to desired length.

2. 

Debur and chamfer end of pipe, removing any ridges 

or rough edges. If end is not chamfered, edge of pipe 

may remove cement from fitting socket and result in a 

leaking joint.

NOTE: 

Check  the  inside  of  vent  pipe  thoroughly  for 

any obstruction that may alter furnace operation.

3. 

Clean and dry surfaces to be joined.

4. 

Test fit joint and mark depth of fitting on outside of pipe.

5. 

Uniformly apply a liberal coat of PVC primer for PVC 

or use a clean dry cloth for ABS to clean inside socket 

surface of fitting and male end of pipe to depth of fitting 

socket.

NOTE: 

Time is critical at this stage. Do not allow 

primer to dry before applying cement.

6. 

Promptly  apply  solvent  cement  to  end  of  pipe  and 

inside  socket  surface  of  fitting.  Cement  should  be 

applied lightly but uniformly to inside of socket. Take 

care  to  keep  excess  cement  out  of  socket.  Apply 

second coat to end of pipe.

7. 

Immediately after applying last coat of cement to pipe, 

and while both inside socket surface and end of pipe 

are wet with cement, forcefully insert end of pipe into 

socket  until  it  bottoms  out.  Turn  PVC  pipe  1/4  turn 

during assembly (but not after pipe is fully inserted) to 

distribute cement evenly. DO NOT turn ABS or cellular 

core pipe.

NOTE: 

Assembly should be completed within 20 

seconds after last application of cement. Hammer 

blows should not be used when inserting pipe.

NF96DV

VENT PIPE  

DIA.  

(in.)

STANDARD

CONCENTRIC

Outdoor Exhaust 

Accelerator  

(Dia. X Length)

Outdoor 

Exhaust 

Accelerator 

(Dia. X Length)

Flush 

Mount 

Kit

1-1/2” 

Concentric 

Kit

2” 

Concentric 

Kit

3” 

Concentric 

Kit

1-1/2” X 12”

2” X 12”

51W11 *

71M80 

or 

+44W92++

69M29 

or 

+44W92++

60L46 

or 44W93+

070

1

 1-1/2

YES

YES

2

YES

YES

YES

2-1/2"

YES

YES

YES

3

YES

YES

YES

090

2

YES

YES

YES

YES

2-1/2"

YES

YES

YES

YES

3

YES

YES

YES

YES

110

2

YES

YES

YES

YES

2-1/2"

YES

YES

YES

YES

3

YES

YES

YES

YES

1

 2 inch to 1-1/2 inch reducer required, must be field provided.

* Requires field-provided and installed 1-1/2” exhaust accelerator.
** Kit 51W11 is provided with a 1-1/2” accelerator, which must be used for all 70,000 furnace installations. When using 1-/2 in. piping, 

the pipe must be transitioned to 2 in. pipe when used with the Flush Mount Kit.

† Termination kits 44W92 and 44W93 are approved for use in Canadian installations to meet CSAB149.
†† The 44W92 concentric kit is provided with a 1-1/2” accelerator, which must be installed on the exhaust outlet when this kit is used 

with the 70,000 furnaces. When using 1-1/2 in. piping, the pipe must be transitioned  to 2 in. pipe when used with the Concentric 

Kit.

Table 8. Outdoor Termination Kits

Содержание GE NF96DV

Страница 1: ...31 5000727 Rev 0 10 22 GEA NF96DV 96 Downflow Two Stage Variable Speed Gas Furnace Service Manual READ CAREFULLY KEEP THESE INSTRUCTIONS...

Страница 2: ...ol on labels or in manuals be alert to the potential for personal injury or death Electric shock hazard Can cause injury or death Before attempting to perform any service or maintenance turn the elect...

Страница 3: ...136 NF96D090V5C 57 000 56 000 88 000 85 000 96 0 5 1 2 120 60 1 20 12 8 40 164 NF96D110V5C 72 000 70 000 110 000 106 000 96 0 5 1 2 120 60 1 20 12 8 40 176 Note For vent length and clearances to combu...

Страница 4: ...0 1230 660 820 940 1120 Norm 680 825 910 1085 575 735 850 995 NF96D090V5C 1 11x11 40 70 High Fire 1395 1555 1695 1825 2nd Stage 1335 1600 1750 1980 1275 1395 1585 1670 1225 1450 1630 1830 Norm 1145 12...

Страница 5: ...g Base 11M60 17 5 B Width 11M61 21 0 C Width Flush Mount Termination 90 Furnaces only 51W11 2 3 0 Vent Concentric Vent Kit 90 Furnaces only 71M80 1 1 2 Vent Version US 69M29 2 Vent Version US 60L46 3...

Страница 6: ...Page 6 31 5000727 Rev 0 Parts Arrangement Figure 1 Access Panel Combustion Air Inducer Burner Box Assembly Gas Valve Control Box Blower Assembly...

Страница 7: ...ensure furnace ignition and ignitor durability The control provides gas ignition safety checks and indoor blower control with two stage gas heating The furnace combustion air inducer gas valve and ind...

Страница 8: ...100 CFM count the flashes and multiply by 100 to determine the actual CFM delivered for example 5 flashes x 100 500 CFM Pin Function 1 Gas Valve Second Stage 2 Second Stage Prove Switch 3 Rollout Swit...

Страница 9: ...Humidifier 120VAC Line Input 120VAC XFMR Transformer 120VAC EAC Indoor Air Accessory 120VAC Cool Cool Speed 120VAC Park 1 Dead terminal for alternate speed tap Park 2 Dead terminal for alternate speed...

Страница 10: ...earings MOTOR CONTROLLER J49 J48 Figure 4 GenTeq Blower Motor B3 STATOR WINDINGS OUTPUT SHAFT BEARING ROTOR Figure 5 Blower Motor Components Internal Operation Each time the controller switches a stat...

Страница 11: ...is the power plug Line voltage must be applied to J48 pins 4 and 5 in order for the motor to operate When using 120VAC pins 1 and 2 must be jumpered Jack J49 connects the unit controls to the motor Th...

Страница 12: ...AT output from controller to motor windings O volts 325VDC One revolution O volts 325VDC O volts 325VDC WINDING 1 WINDING 2 WINDING 3 O volts 325VDC O volts 325VDC O volts 325VDC WINDING 1 WINDING 2 W...

Страница 13: ...e burner box front panel in place Each burner uses an orifice that is precisely matched to the burner input Burners can be removed as a one piece assembly for service If burner assembly has been remov...

Страница 14: ...Page 14 31 5000727 Rev 0 Intake Air Top Cap Sensor Rollout Switch Rollout Switch Burner Assembly Ignitor Manifold And Gas Orifices Two Stage Gas Valve Burner Box Cover Figure 9 Heating Components...

Страница 15: ...ug Reading should be between 39 and 70 ohms If the reading is correct then the problem is with the wiring between the jack plug and the control If reading is not correct the issue is the ignitor Test...

Страница 16: ...inside the combustion air inducer decreases to a certain set point Set points vary depending on unit size See Table 6 The pressure sensed by the switch is negative relative to atmospheric pressure If...

Страница 17: ...square tubing and tee into the tubing from the negative side of the cold end header box and the other side of the 2 square tubing Connect the other end of the 10 square tubing the the negative side o...

Страница 18: ...commended during cooler weather Metal or plastic strapping may be used for vent pipe hangers Uniformly apply a liberal coat of PVC primer for PVC or use a clean dry cloth for ABS to clean inside socke...

Страница 19: ...et with cement forcefully insert end of pipe into socket until it bottoms out Turn PVC pipe 1 4 turn during assembly but not after pipe is fully inserted to distribute cement evenly DO NOT turn ABS or...

Страница 20: ...only run with separate gas appliances the venting system is likely to be too large to properly vent the remaining attached appliances CHIMNEY OR GAS VENT Check sizing for water heater only FURNACE WAT...

Страница 21: ...y of the preceding tests the common venting system must be modified to correct the problem Resize the common venting system to the minimum vent pipe size determined by using the appropriate tables in...

Страница 22: ...listed in Table 10C If 3 diameter pipe is used reduce to 2 diameter pipe to accommodate the debris screen 3 Route piping to outside of structure Continue with installation following instructions given...

Страница 23: ...rm venting system for assembly or if requirements are more restrictive The PolyPro by Duravent and InnoFlue by Centrotherm venting system must also follow the uninsulated and unconditioned space crite...

Страница 24: ...pe MUST be glued to furnace exhaust fittings NOTE Exhaust piping should be checked carefully to make sure there are no sags or low spots NOTE If right side venting option is used you must include the...

Страница 25: ...3 8 87 68 68 9 11 60 38 n a 82 63 63 10 6 55 33 77 58 58 Standard Termination Elevation 4500 10 000 ft Number of 90 Elbows Used 1 1 2 Pipe 2 Pipe 2 1 2 Pipe 3 Pipe Model Model Model Model 070 090 110...

Страница 26: ...a 55 39 n a 71 64 64 9 50 34 66 59 59 10 45 29 61 54 54 Concentric Termination Elevation 4 501 10 000 ft Number of 90 Elbows Used 1 1 2 Pipe 2 Pipe 2 1 2 Pipe 3 Pipe Model Model Model Model 070 090 1...

Страница 27: ...Z223 1 NFPA 54 in U S A and current CSA B149 Natural Gas and Propane Installation Codes in Canada for details Position termination according to location given in Figure 22 or Figure 31 In addition po...

Страница 28: ...3 N A N A N A N A N A 2 in 12 10 19 16 18 15 2 1 2 in 7 N A 13 N A 12 N A 3 in N A N A 8 8 7 7 1 Refer to 99 Minimum Design Temperature table provided in the current edition of the ASHRAE Fundamentals...

Страница 29: ...s 152mm for appliances 10 000 pliances 10 000 Btuh 3kw and 50 000 pliances 50 000 Btuh 15kw 6 inches 152mm for appliances 10 000 Btuh 3kw 12 inches 305mm for appliances 10 000 Btuh 3kw and 100 000 Btu...

Страница 30: ...e Inlet Air Minimum 12 in 305MM above grade or snow accumulation Figure 25 Exiting Exhaust and Intake Vent no common pressure zone 1 Intake and exhaust pipes should be placed as close together as poss...

Страница 31: ...D REDUCER MAY BE REQUIRED TO ADAPT LARGER VENT PIPE SIZE TO TERMINATION 12 305mm INTAKE AIR EXHAUST VENT Figure 30 Direct Vent Concentric Rooftop Termination 71M80 69M29 or 60L46 US 44W92 or 44W93 Can...

Страница 32: ...above paved sidewalk or paved driveway located on public property Clearance under veranda porch deck or balcony 12 Equal to or greater than soffit depth 3 feet 9m 12 3 feet 9m within a height 15 feet...

Страница 33: ...exhaust pipe size must be done after the final elbow 4 Distance between exhaust pipe terminations on multiple furnaces must meet local codes UNCONDITIONED ATTIC SPACE 3 76MM OR 2 51MM PVC PROVIDE SUP...

Страница 34: ...bove grade or average snow accumulation B Horizontal separation between intake and exhaust C Minimum from end of exhaust to inlet of intake D Exhaust pipe length E Wall support distance from top of ea...

Страница 35: ...for all provinces of Canada GEA approves the following termination for use in all provinces of Canada C 12 D B A 2 51MM Vent Pipe 3 76MM Vent Pipe 12 305 mm Min 12 305 mm Min 6 152 mm Min 24 610 mm Ma...

Страница 36: ...the unused plug for tightness to prevent leakage 2 Install the cap over the clean out opening at the base of the trap Secure with clamp See Figure 41 and Figure 42 3 Install drain trap using appropria...

Страница 37: ...t be used Condensate drain line should be routed within the conditioned space to avoid freezing of condensate and blockage of drain line If this is not possible a heat cable kit may be used on the con...

Страница 38: ...h PVC Pipe Not Furnished Drain Assembly for 3 4 inch Drain Pipe Condensate Drain Connection In Unit Condensate Drain Connection In Unit Vent To Drain Condensate Drain Connection In Unit Optional Conde...

Страница 39: ...inch PVC To Drain 90 Elbow 1 2 inch PVC Not Furnished 1 2 inch PVC Pipe Not Furnished Drain Assembly for 3 4 inch Drain Pipe 90 Street Elbow 1 2 inch PVC Not Furnished Condensate Drain Connection In...

Страница 40: ...ove the switch Never use tools If the the switch will not move by hand replace the valve Do not try to repair it Force or attempted repair may result in a fire or explosion Placing the Furnace into Op...

Страница 41: ...trol to shut the unit off 6 Is gas turned on at the meter 7 Is the manual main shut off valve open 8 Is the internal manual shut off valve open 9 Is the unit ignition system in lockout If the unit loc...

Страница 42: ...positive side to manifold pressure tap on gas valve as noted above 2 Tee into the gas valve regulator vent hose and connect to test gauge negative 3 Ignite unit on low fire and let run for 5 minutes t...

Страница 43: ...1 10000ft Low Fire High Fire Low Fire High Fire Low Fire High Fire Low Fire High Fire Low Fire High Fire Min Max All Models Natural 1 7 3 5 1 6 3 3 1 5 3 2 1 5 3 1 1 7 3 5 4 5 13 0 Lp Propane 4 9 10 0...

Страница 44: ...n of load indicates a poor or partial ground Compare the readings to Table 17 If the readings exceed the maximum shown in Table 17 make repairs before operating the furnace 1 In addition measure the A...

Страница 45: ...Temperature Return Duct Temperature _ Temperature Rise Figure 47 Temperature Rise External Static Pressure 1 Tap locations shown in Figure 47 2 Punch a 1 4 diameter hole in supply and return air plen...

Страница 46: ...The pressure drop may also cause the limit to trip more frequently during the winter and the indoor coil to freeze in the summer resulting in an increase in the number of service calls Before using an...

Страница 47: ...emove the assembly Keep tubing attached to pressure switches 2 Disconnect the plug from the combustion air inducer Remove two screws which secure combustion air inducer to collector box Remove combust...

Страница 48: ...from the gas valve 3 Remove the burner box cover if equipped 4 Disconnect the gas supply line from the gas valve Remove gas valve manifold assembly 1 Mark and disconnect sensor wire from the sensor D...

Страница 49: ...WITH WIRING MATERIAL HAVING A TEMP RATING OF AT LEAST 90 c 3 PROPER POLARITY MUST BE OBSERVED FOR FIELD LINE VOLTAGE SUPPLY IGNITION CONTROL WILL LOCK OUT IF POLARITY IS REVERSED 4 FOR TEMPORARY SERV...

Страница 50: ...ains energized until the limits are closed Fan On When the thermostat is set for continuous fan operation and there is no demand for heating or cooling a call for fan closes the R to G circuit and the...

Страница 51: ...Page 51 31 5000727 Rev 0 Notes...

Страница 52: ...Page 52 31 5000727 Rev 0 Printed in the U S A All specifications and illustrations subject to change without notice and without incurring obligations...

Отзывы: