
– 39 –
Replacing Sealed System Components
Evacuation and Charging Procedure
The following information covers the evacuation and charging procedure for sealed system work.
WARNING:
Before cutting or using a torch on refrigerant tubes, recover the refrigerant from the system using
approved recovery equipment.
Never charge new refrigerant through the purge valve. This valve is always located on the high
pressure side of the system.
Never apply heat from any source to a container of refrigerant. Such action will cause excessive
pressure in the container.
Always wear appropriate PPE (Personal Protective Equipment) when working with refrigerants and
nitrogen holding a charge in some replacement parts. Contact with these gases may cause injury.
1. Evacuate the system to ~20-in. vacuum using the refrigerator compressor and/or recovery pump.
2. Purge the system using nitrogen at 25-35 SCFH.
3. Perform necessary repairs to the sealed system.
4. Pressurize the system to 250 PSIG with nitrogen and test for leaks.
5.
2QFH FRQ¿UPHG WKDW QR OHDNV DUH SUHVHQW HYDFXDWH WKH QLWURJHQ DQG XVH WKH FRPSUHVVRU WR SXOO
the system back into a vacuum.
6.
&KDUJH WKH V\VWHP ZLWK WKH H[DFW DPRXQW RI UHIULJHUDQW VSHFL¿HG RQ WKH QDPH SODWH RU VSHFL¿HG RQ
the instruction sheet included with the component being replaced.
7. Reinstall caps to Schrader ports.
Содержание GE ABE21D
Страница 1: ...GBE21D ABE21D 2016 Artistry GE Swing Door Refrigerators Technical Service Guide March 2018 31 9285 ...
Страница 11: ... 11 LUÀRZ ...
Страница 33: ... 33 Main Board Connector Locations J10 J8 J11 J13 J4 J3 J1 J2 J7 J9 ...
Страница 40: ... 40 Schematic ...