![hager XEM800 Скачать руководство пользователя страница 39](http://html2.mh-extra.com/html/hager/xem800/xem800_installation-instructions-manual_3065932039.webp)
Page 39/44
05-2021
6LE007528B
The configuration for commissioning in connection with the Hager
flow
system is described
in the energy management controller instruction XEM461 under "Connecting the storage
device with
flow
".
The LED lights up green on the battery modules.
The energy storage system starts to commission automatically with the battery training. The
battery training serves to calibrate the calculation of the state of charge (SOC) of the battery.
Meanwhile, the battery is charged up to 100% without accounting for the household con-
sumption, then fully discharged without accounting for the photovoltaic energy generated.
Once the battery training has been completed, the device automatically enters normal oper-
ation.
If batteries are replaced at a later date or another battery is added to the system, the battery
training also starts automatically with the re-commissioning process.
►
For details see the energy management controller installation and configuration in-
structions
hager.com
Subject to technical changes
flow
Energy storage system