Doors for flush and surface enclosures
32
Technical changes reserved
5.2 Door mounting into enclosure frames
In New VegaD flush enclosures, customer doesn´t have to punch out metal openings for door closing
latch anymore, as they are already punched. This point was heavily criticized by customers speaking
about old VegaD flush, as the punching-out of steel part could have caused damages on frame or
injuries.
In New VegaD surface enclosures, customer doesn´t have to punch out plastic openings for door
closing latch anymore, as they are already extruded. This point was also criticized by customers
speaking about old VegaD surface, as the punching-out of plastic part could have caused damages on
plastic surface.
Содержание FD22ACN
Страница 1: ...Technical Manual New VegaD for surface mounting flush mounting Accessories...
Страница 8: ...About the New VegaD enclosure 8 Technical changes reserved FDX2GN empty FDX2ZN tarif bleu triphas...
Страница 37: ...Accessories Technical changes reserved 37 MCCB fixing on metal plate with M4 screws delivered by...
Страница 42: ...Accessories 42 Technical changes reserved...
Страница 47: ...Accessories Technical changes reserved 47 See mounting instruction below...
Страница 48: ...Accessories 48 Technical changes reserved...
Страница 52: ...Accessories 52 Technical changes reserved...
Страница 75: ...Accessories Technical changes reserved 75...
Страница 116: ...Wall fixation 116 Technical changes reserved Example of flush low depth enclosure protection against plastering...
Страница 121: ...Technical changes reserved 121 9 3 2 VDE CB certification for Standard IEC 61439 1 3 Technical datas certifications...
Страница 122: ...122 Technical changes reserved 9 3 3 LCIE certification for NF Standard EN 61439 1 3 Technical datas certifications...