Accessories
68
Technical changes reserved
Step
Action
4
Insert top enclosure through fixing plates above first enclosure [27]
5
Screw them from the inside with M6 screws [27]
6
Put insulation caps above all M6 screw heads [27]
Horizontal association (first enclosure already wall-mounted):
needed are following parts:
Содержание FD22ACN
Страница 1: ...Technical Manual New VegaD for surface mounting flush mounting Accessories...
Страница 8: ...About the New VegaD enclosure 8 Technical changes reserved FDX2GN empty FDX2ZN tarif bleu triphas...
Страница 37: ...Accessories Technical changes reserved 37 MCCB fixing on metal plate with M4 screws delivered by...
Страница 42: ...Accessories 42 Technical changes reserved...
Страница 47: ...Accessories Technical changes reserved 47 See mounting instruction below...
Страница 48: ...Accessories 48 Technical changes reserved...
Страница 52: ...Accessories 52 Technical changes reserved...
Страница 75: ...Accessories Technical changes reserved 75...
Страница 116: ...Wall fixation 116 Technical changes reserved Example of flush low depth enclosure protection against plastering...
Страница 121: ...Technical changes reserved 121 9 3 2 VDE CB certification for Standard IEC 61439 1 3 Technical datas certifications...
Страница 122: ...122 Technical changes reserved 9 3 3 LCIE certification for NF Standard EN 61439 1 3 Technical datas certifications...