background image

Adjust the door brackets to the desired height. Note - thee lower bracket has limited height adjustment. It should be

fixed in a position so that it does not clash with (L) or the cabinet edge. Once both door brackets have been set at an

appropriate heights firmly secure in place by tightening the 4 x M6 x 25 mm pozi screws.

Take measurements and transfer them to the back of the cabinet door. Pre-drill 5 mm pilot hole to a depth of 13 mm

being careful not to damage the front face of the door.

20

21

Fix the door

to the door brackets using 4 x euro screws

 

and adjust the door using tilt and alignment using 4 x M5 x 10 mm

screw. Further adjustment can be made by loosening the 4 x 25 x 10 mm pozi screws and repositioning the door

before re-tightening although care must be taken that the lower door bracket does not foul the cabinet side or the

swing bracket. For tilt adjustment loosen the euro screws slightly and then screw 4 x M5 x 10 mm screws into the

bracket to achieve the desired tilt alignment.

fixing hole

Tilt  

fixing hole

Tilt  

1

3

2

FITTING BASKETS

1.

 Tilt the front of the basket upwards

    by 45˚.

2.

 Insert the pins on the basket into

    the holes on the frame.

3.

 Lower the front of the basket into

    place (horizontal position). 

Sales and Technical Support -

Tel: 0800 171 2908, Fax: 01788 544440, E-Mail: [email protected], www.hafele.co.uk

Содержание 800 RH

Страница 1: ...ewdriver Bradawl A Using a tape measure and pencil mark out 5 x 5 mm holes for the top plate B at a height of 510 mm height from hole centre to cabinet base as shown above Pre drill using a 5 mm drill bit Do not fix the top plate at this point B Locate base plate A inline with the front edge of the cabinet Pre drill 4 x 5 mm holes and secure with 4 x Euro screws 1 Spirit level Allen key supplied P...

Страница 2: ...damper as the frame is extended and returned to the closed position 4 Roller assembly Assemble roller bearing F to bracket E using 1 x M5 x 12 mm allen bolt 5 Roller guide assembly Assemble roller bearing G to bracket H using 1 x M5 x 12 mm allen bolt 6 Position Roller assembly into the channel on frame D as in fig 1 above then fix to frame C fig 2 using 2 x M4 x 10 mm allen bolts 7 Fix roller gui...

Страница 3: ...st hole on the top plate with the corresponding pilot hole on the cabinet with 1 x Euroscrew fig 1 Lift the front edge of top plate B fig 2 so that the assembled frame can be lowered into position allowing the bottom end cap on frame C fig 3 to locate with the pin on base plate A ensuring that the roller guide assembly locates into the guide channel on base plate A fig 4 Lower top plate B so that ...

Страница 4: ...rill 4 x 2 mm pilot holes DO NOT INSTALL AT THIS POINT 14 Fix the runner P to rear frame assembly N using 2 x M4 x 10 mm allen bolts 15 2 mm IMPORTANT PLEASE ENSURE The top rear frame must be level and parallel with the cabinet base The rear of the top rear frame O must be fixed so it is flush with the rear of top plate B for the fully assembled unit to function correctly please ensure a spirit le...

Страница 5: ...ing on the top plate B position the frame so it lies flush with the rear of top plate B then secure using 4 x 16 mm No 8 pozi pan head screws 2 at each end into the pre drilled pilot holes if this unit is being fitted into a cabinet with 16 mm sides the spacers S can be used as shown above 17 Sales and Technical Support Tel 0800 171 2908 Fax 01788 544440 E Mail info hafele co uk www hafele co uk ...

Страница 6: ...n L and rear frame N Check that when the frame is pulled outside the cabinet that the rear frame slides to an accessible position If this is not the case then check you have followed the previous assembly steps and dimensions correctly 19 Check vertical then fix 400 305 420 Sales and Technical Support Tel 0800 171 2908 Fax 01788 544440 E Mail info hafele co uk www hafele co uk ...

Страница 7: ...he door using tilt and alignment using 4 x M5 x 10 mm screw Further adjustment can be made by loosening the 4 x 25 x 10 mm pozi screws and repositioning the door before re tightening although care must be taken that the lower door bracket does not foul the cabinet side or the swing bracket For tilt adjustment loosen the euro screws slightly and then screw 4 x M5 x 10 mm screws into the bracket to ...

Страница 8: ...ot hole is drilled before fixing any part s to the cabinet FIXINGS 24 x M4 x 10 mm Allen bolt 13 x Euro screw 4 x M6 x 25 mm Pozi pan head machine screw 3 x M5 x 12 mm Allen bolt 4 x 16 mm No 8 Pozi pan head wood screw 2 x 16 mm No 8 Pozi Countersunk wood screw 4 x M5 x 10mm Pozi pan head machine screw 2 x M4 Nyloc nut 3 x Roller bearings 2 x Spacers 1 x End cap grey plastic 400 ...

Отзывы: