17
Testing of the Electrical Setup
The Machine Setup must be completed before testing the
electrical setup.
1.
Turn the machine’s Main Disconnect Switch to the On
position
2.
Twist the Red Mushroom Button clockwise to unlatch the off switch.
3.
Using the touch screen Press the
On/Off
Button. The On switch in the up position will turn on the
machine’s motor.
4.
If the motor rotates the same direction as the arrow, install the Side Panels on the Machine Base.
The machine is now ready for use go to the
Upper Tool Holder
section.
If the motor
did not turn in the same direction as the arrow
, follow
to the next series of steps.
Содержание 618 MSPe
Страница 1: ...618 MSPe Operation Manual ...
Страница 66: ...62 Main Assembly ...
Страница 69: ...65 Sheet Metal ...
Страница 72: ...68 Dual Safety Sensor Assembly ...
Страница 78: ...74 Electrical Cabinet ...
Страница 81: ...77 Hydraulic Reservoir Assembly ...
Страница 83: ...79 Hydraulic Manifold Subassembly ...
Страница 87: ...83 MAS 9 Autofeed Optional ...
Страница 89: ...85 MAS 350 Autofeed Optional ...