HADEF 22/90 Скачать руководство пользователя страница 9

 

 

 

 

5.52.653.00.01.06 

 

 

 

6.3.1 

Bolt securing with collar 

Securing the load bolts with set collars (1) and safety 
screws (3). 

 

  In order to adjust the beam flange width dismantle 

the safety screws (3) at one trolley side. 

  After adjustment of dimension "X" and installation on 

the beam, install the safety screws (3) again and 
secure them with a nut (4). 

  When pulling apart the side plates, the trolley drive 

shaft will also be moved. 

  To do this, loosen the safety screws at the stern tube 

bearing and secure them again after the side plates 
have been pushed together. 

 

Illustration 2 

 

 

1  set collar 

2  load bar 

3  safety screw 

4  hexagon nut 

5  washer

 

 

 

 

   

CAUTION!

 

The distance “X” between the wheel flanges of the trolley wheels must be 
for trolleys up to 3,2 t: 2-3 mm (1-1,5 mm each side) bigger and 

for trolleys from 4 t up: 3-5 mm (1,5-2,5 mm each side) bigger than the flange width "B" of the beam 

 

6.4 

Tools 

 

 

Control 

 

Only people that are familiar with the operation of the lifting devices and cranes may be entrusted with their 
operation. They must be authorized by the employer for the operation of the equipment. The employer must 
ensure that the operating instructions are available near the equipment and that they are accessible for the 
operating personnel.  

 

Monorail push travel trolleys are moved by pushing the load. 

Monorail hand geared trolleys are moved by pulling the hand chain. 

 

 

 

Control buttons 

Control symbols shown are for optical information only and can vary depending on the control module. 

 

 

Emergency stop 

 

 

Illustration 3 

 

 

 

 

Capacity 

Size 

Tool 

Use 

 

0,5t 

1t 

to 2t 

to 3,2t 

to 6,3t 

to 10t 

SW27 

SW36 

SW46 

SW55 

SW60 

SW75 

 

Load bar 

 

12,5t 

to 60t 

SW22 

SW24 

 

Load bar  

with 

fixing ring 

 

 

diff. 

 

 

 

Содержание 22/90

Страница 1: ...Rev 06 5 52 653 00 01 06 Monorail Trolley 19 90 22 90 push travel trolley 19 90 hand geared trolley 22 90 electric trolley 22 90 E Installation Operating and Maintenance Instructions...

Страница 2: ...mation 3 2 Safety 3 2 1 Warning notice and symbols 3 2 2 Duty of care of the owner 4 2 3 Requirements for the operating personnel 4 2 4 Appropriate use 4 2 5 Basic safety measures 5 3 Transport and St...

Страница 3: ...efore delivery all products are packed properly Check the goods after receipt for any damage caused during transport Report any damage immediately to the forwarding agent This manual allows a safe and...

Страница 4: ...ctional condition and the safety components in particular are checked regularly to ensure that it is functioning properly The required personal protective equipment for the operators service and repai...

Страница 5: ...the load Only use the hoists appropriately The equipment is to be used exclusively for movement of goods Under no circumstances my persons be moved Never load the devices beyond their working load lim...

Страница 6: ...sible installed in a covered room If they are used in the open protect the units against the effects of weather such as rain hail snow direct sunshine dust etc we recommend to use a cover in parking p...

Страница 7: ...ectric trolley 16 4 m min Weights Type bolt Size 500 kg 1 t 1 5 t 2 t 2 5 t 3 2 t 5 t 6 3 t 19 90 N1 4 1 6 8 7 8 7 8 16 6 16 6 31 5 31 5 N2 4 5 8 5 9 9 9 9 19 9 19 9 39 4 39 22 90 N1 5 4 8 1 9 2 10 9...

Страница 8: ...uated on the load bars 2 of the trolley Dimension X is set by placing washers 6 from the outer to the inner side X increases or from the inner to the outer side X decreases Washers 6 and rubber discs...

Страница 9: ...2 3 mm 1 1 5 mm each side bigger and for trolleys from 4 t up 3 5 mm 1 5 2 5 mm each side bigger than the flange width B of the beam 6 4 Tools 7 Control Only people that are familiar with the operatio...

Страница 10: ...bserve the duty cycle i e intermittent operation S3 40 ED as per VDE 0530 means that in a period of 10 minutes the motor can operate no matter the height of the load for 4 minutes It is therefore irre...

Страница 11: ...nnection The technical dates of the motors are to be taken from the type plates The wiring diagram is situated in the terminal box Select connection cross sections as per VDE 0100 Put sleeves on the e...

Страница 12: ...ing 1 into the shaft slot 2 Insert the feather key 2 into the motor shaft 3 Fix hub 3 with retaining ring 1 4 Assemble the friction plate 4 if existent 5 Push the rotor 5 onto the hub 3 6 Lock the mag...

Страница 13: ...sufficient to keep the cooling airways clean and monitor the roller bearing and its lubrication status A high temperature fat must be used if the roller bearing is replaced CAUTION Brake linings and s...

Страница 14: ...be changed completely If the unit is suitable for explosive atmospheres the motor must be returned to the manufacturer for repair Air gap is too large Re adjust the air gap If the unit is suitable fo...

Страница 15: ...the equipment and any materials it contains is carried out in accordance with environmental regulations 18 Additional documents 18 1 Electric wiring diagrams Electric wiring diagrams are attached to...

Отзывы: