5.52.653.00.01.06 

 

Type 

bolt 

Size 

                                                                                           

 

7,5

 t 

10

 t 

12,5

 t 

16

 t 

20

 t 

25

 t 

32

 t 

40

 t 

50

 t 

19/90

 

N1

 

69 

88 

N2

 

71 

91 

22/90*

 

N1

 

71 

92 

220 

200 

430 

500 

630 

820 

1010 

N2

 

73 

95 

22/90 E

 

N1

 

81 

103 

204 

291 

403 

N2

 

82 

107 

*without hand chain 

 

 

3-phase current motor 400V/50Hz - IP55 

– F – max. 1000 m above sea level. 

Order-related Special data, refer to the motor nameplate. 

 

Installation 

 

 

The assembly and installation depends on the local environment. The hoist must be suspended in a way that 
it can position itself freely. 

 

 

6.1 

Trolley 

For assembly on a beam a travel limit must be placed at either end of the track. 

This  must  be  attached  so  that  any  elastic  limitation  buffer  or  the  trolley  wheels  are  driven  against  them  in 
their end position when moving.  

Generally, additional lifting gear (e.g. fork lift, lifting platforms) will be required for the assembly. These must 
take the weight of the devices securely. 

 

6.2 

Adjusting the gauge 

The trolley can be adjusted to vari

ous beam flange widths. Adjustment to the relevant beam flange width “B” 

depends on the type and size and is to be made as follows: 

  There are distance tubes (5) and/or washers 

(6) situated on the load bars (2) of the trolley. 

  Dimension "X" is set by placing washers (6) 

from the outer to the inner side ("X" increases) 
or from the inner to the outer side ("X" 
decreases). 

  Washers (6) and rubber discs (depended on 

type) leave a distance for the load hook. It is 
important that the load hangs in the middle 
under the beam so that the two side plates are 
equally loaded. 

  The suspension eye (9) (if existent) for bigger 

load bolts must still be swivelling after it has 
been secured. 

  Tighten the hexagon nut (3) and safety nuts (4) 

again. 

  Check correct flange width "B" and dimension 

"X". Adjustment must be repeated if necessary. 

 

                    

     

 

 

1  side plates 

2  load bars 

3  hexagon nut 

4  safety nuts 

5  distance tubes 

6  washers 

7  --- 

8   rubber disc (depended on type) 

9   suspension eye

 

 

 

6.3 

Installation on the beam 

1  Tighten the hexagon nut (3) and safety nuts (4). 

2  Push on the trolley at the face of the beam flange. 

3  If  this  is  not  possible,  the trolley  can  also  be  mounted 

on the beam from below. 

4  Therefore, remove the hexagon nut (3) and the safety 

nut (4) on the side without gear. 

5  Pull apart the side plates (1) as far until it is possible to 

push  the  trolley  onto  the  beam  flange  from  below. 
Afterwards, push the trolley together to correct gauge. 

6  Secure  the  washers  (6)  and  distance  tubes  (5)  by 

tightening the hexagon nuts (3) and the safety nuts (4). 

 

 

Illustration 1 

 

 

 

Содержание 22/90

Страница 1: ...Rev 06 5 52 653 00 01 06 Monorail Trolley 19 90 22 90 push travel trolley 19 90 hand geared trolley 22 90 electric trolley 22 90 E Installation Operating and Maintenance Instructions...

Страница 2: ...mation 3 2 Safety 3 2 1 Warning notice and symbols 3 2 2 Duty of care of the owner 4 2 3 Requirements for the operating personnel 4 2 4 Appropriate use 4 2 5 Basic safety measures 5 3 Transport and St...

Страница 3: ...efore delivery all products are packed properly Check the goods after receipt for any damage caused during transport Report any damage immediately to the forwarding agent This manual allows a safe and...

Страница 4: ...ctional condition and the safety components in particular are checked regularly to ensure that it is functioning properly The required personal protective equipment for the operators service and repai...

Страница 5: ...the load Only use the hoists appropriately The equipment is to be used exclusively for movement of goods Under no circumstances my persons be moved Never load the devices beyond their working load lim...

Страница 6: ...sible installed in a covered room If they are used in the open protect the units against the effects of weather such as rain hail snow direct sunshine dust etc we recommend to use a cover in parking p...

Страница 7: ...ectric trolley 16 4 m min Weights Type bolt Size 500 kg 1 t 1 5 t 2 t 2 5 t 3 2 t 5 t 6 3 t 19 90 N1 4 1 6 8 7 8 7 8 16 6 16 6 31 5 31 5 N2 4 5 8 5 9 9 9 9 19 9 19 9 39 4 39 22 90 N1 5 4 8 1 9 2 10 9...

Страница 8: ...uated on the load bars 2 of the trolley Dimension X is set by placing washers 6 from the outer to the inner side X increases or from the inner to the outer side X decreases Washers 6 and rubber discs...

Страница 9: ...2 3 mm 1 1 5 mm each side bigger and for trolleys from 4 t up 3 5 mm 1 5 2 5 mm each side bigger than the flange width B of the beam 6 4 Tools 7 Control Only people that are familiar with the operatio...

Страница 10: ...bserve the duty cycle i e intermittent operation S3 40 ED as per VDE 0530 means that in a period of 10 minutes the motor can operate no matter the height of the load for 4 minutes It is therefore irre...

Страница 11: ...nnection The technical dates of the motors are to be taken from the type plates The wiring diagram is situated in the terminal box Select connection cross sections as per VDE 0100 Put sleeves on the e...

Страница 12: ...ing 1 into the shaft slot 2 Insert the feather key 2 into the motor shaft 3 Fix hub 3 with retaining ring 1 4 Assemble the friction plate 4 if existent 5 Push the rotor 5 onto the hub 3 6 Lock the mag...

Страница 13: ...sufficient to keep the cooling airways clean and monitor the roller bearing and its lubrication status A high temperature fat must be used if the roller bearing is replaced CAUTION Brake linings and s...

Страница 14: ...be changed completely If the unit is suitable for explosive atmospheres the motor must be returned to the manufacturer for repair Air gap is too large Re adjust the air gap If the unit is suitable fo...

Страница 15: ...the equipment and any materials it contains is carried out in accordance with environmental regulations 18 Additional documents 18 1 Electric wiring diagrams Electric wiring diagrams are attached to...

Отзывы: