HADEF 22/90 Скачать руководство пользователя страница 10

 

 

 

 

10 

 

 

5.52.653.00.01.06 

 

Arrow keys = drive left / right 

 

 

 

Illustration 4 

 

 

 

 

System start (optional) 

 

Illustration 5 

     

 

 

 

Push button functions (E) 

 

Relieved push button = stand still 

push button half pushed = slow speed 

push button pushed completely = fast speed 

 

 

Illustration 6 

 

 

 

Red Emergency-Stop button 

 

button pushed = stand still 

turn the button clockwise = free functions 

 

 

Illustration 7 

 

 

NOTICE!

 

Lockable Emergency-Stop buttons must first be opened with the key before unlocking! 

 

 

Operation 

 

The following, important points must be observed when operating the equipment: 

  Read the safety instructions. 

  Never load the devices beyond their working load limit. 

  When changing the motor turning direction, allow the motor to come to a standstill first. 

  The prescribed maintenance intervals must be adhered to. 

 

  Observe the duty cycle, i.e. intermittent operation S3-40% ED (as per VDE 0530) means that in a period 

of  10  minutes  the  motor  can  operate 

– no matter the height of the load – for 4 minutes.  It is therefore 

irrelevant whether the 4 minutes are continuous (i.e., in case of very high lifting heights) or are made in 
intervals. 

 

 

 

 

 

   

DANGER!

 

In particular, use is not permitted: 

    in  potentially  explosive  atmospheres,  unless  the  equipment  has  been  modified  for  this  purpose  and                    

this is shown on special type plates it carries for this purpose. 

    in reactor containments 

    for transporting persons  

    for holding lifted loads 

    for scenic use 

    when persons are under suspended loads 

 

 

Commissioning 

 

9.1 

General 

The operator of the unit is responsible for the entire system. 

According  to  the  Ordinance  on  Industrial  Safety  and  Health,  a  hazard  analysis  must  be  carried  out  by  the 
operator. 

Observe the respective national standards, regulations and directives of the responsible bodies at the place 
of operation.  

Содержание 22/90

Страница 1: ...Rev 06 5 52 653 00 01 06 Monorail Trolley 19 90 22 90 push travel trolley 19 90 hand geared trolley 22 90 electric trolley 22 90 E Installation Operating and Maintenance Instructions...

Страница 2: ...mation 3 2 Safety 3 2 1 Warning notice and symbols 3 2 2 Duty of care of the owner 4 2 3 Requirements for the operating personnel 4 2 4 Appropriate use 4 2 5 Basic safety measures 5 3 Transport and St...

Страница 3: ...efore delivery all products are packed properly Check the goods after receipt for any damage caused during transport Report any damage immediately to the forwarding agent This manual allows a safe and...

Страница 4: ...ctional condition and the safety components in particular are checked regularly to ensure that it is functioning properly The required personal protective equipment for the operators service and repai...

Страница 5: ...the load Only use the hoists appropriately The equipment is to be used exclusively for movement of goods Under no circumstances my persons be moved Never load the devices beyond their working load lim...

Страница 6: ...sible installed in a covered room If they are used in the open protect the units against the effects of weather such as rain hail snow direct sunshine dust etc we recommend to use a cover in parking p...

Страница 7: ...ectric trolley 16 4 m min Weights Type bolt Size 500 kg 1 t 1 5 t 2 t 2 5 t 3 2 t 5 t 6 3 t 19 90 N1 4 1 6 8 7 8 7 8 16 6 16 6 31 5 31 5 N2 4 5 8 5 9 9 9 9 19 9 19 9 39 4 39 22 90 N1 5 4 8 1 9 2 10 9...

Страница 8: ...uated on the load bars 2 of the trolley Dimension X is set by placing washers 6 from the outer to the inner side X increases or from the inner to the outer side X decreases Washers 6 and rubber discs...

Страница 9: ...2 3 mm 1 1 5 mm each side bigger and for trolleys from 4 t up 3 5 mm 1 5 2 5 mm each side bigger than the flange width B of the beam 6 4 Tools 7 Control Only people that are familiar with the operatio...

Страница 10: ...bserve the duty cycle i e intermittent operation S3 40 ED as per VDE 0530 means that in a period of 10 minutes the motor can operate no matter the height of the load for 4 minutes It is therefore irre...

Страница 11: ...nnection The technical dates of the motors are to be taken from the type plates The wiring diagram is situated in the terminal box Select connection cross sections as per VDE 0100 Put sleeves on the e...

Страница 12: ...ing 1 into the shaft slot 2 Insert the feather key 2 into the motor shaft 3 Fix hub 3 with retaining ring 1 4 Assemble the friction plate 4 if existent 5 Push the rotor 5 onto the hub 3 6 Lock the mag...

Страница 13: ...sufficient to keep the cooling airways clean and monitor the roller bearing and its lubrication status A high temperature fat must be used if the roller bearing is replaced CAUTION Brake linings and s...

Страница 14: ...be changed completely If the unit is suitable for explosive atmospheres the motor must be returned to the manufacturer for repair Air gap is too large Re adjust the air gap If the unit is suitable fo...

Страница 15: ...the equipment and any materials it contains is carried out in accordance with environmental regulations 18 Additional documents 18 1 Electric wiring diagrams Electric wiring diagrams are attached to...

Отзывы: