background image

45

Maintenance

6.4 Shut the analyzer down

No special measures are necessary for taking out of operation for a 
short period (up to a few days in frost-free ambient conditions).

Important note: 

If the power supply to the controller is interrupted, 

frost damage may occur. Ensure that the instrument and tubing 
cannot freeze. 

1.

Interrupt the measurement and switch the instrument to the 
service state.

2.

Isolate the analysis instrument from the controller.

6.4.1 Shut the analyzer down for an extended period

Important note: 

Always wear safety equipment when handling 

chemicals.

Figure 19 Modification of PHOSPHAX sc

1

Overflow vessel

4

Valve block

2

Fitting of sample tube

5

Sample tube

3

Blind plug

Содержание PHOSPHAX indoor sc

Страница 1: ...DOC026 53 00026 PHOSPHAX sc PHOSPHAX indoor sc USER MANUAL 04 2013 Edition 6 PHOSPHAX sc PHOSPHAX indoor sc HACH Comp 2006 2010 2012 2013 All rights reserved Printed in Germany sd sk...

Страница 2: ......

Страница 3: ...ns 25 3 5 2 Enclosure breakouts 25 3 5 3 Insert tubing and or cables 26 3 5 4 Connect the Filter Probe sc to the analyzer optional 26 3 5 5 Connect the optional heated drain 27 3 6 Installation of rea...

Страница 4: ...nsiderations 65 A 5 Option 1 plumbing and connections 66 A 6 Option 2 plumbing and connections 68 A 7 Option 3 plumbing and connections 70 A 8 Option 4 plumbing and connections 72 A 9 Option 5 plumbin...

Страница 5: ...rical fuse protection Via sc1000 controller Maximum of 2 analysis instruments for each sc1000 Outputs Relay current outputs network interface via sc1000 controller Refer to the sc1000 manual for detai...

Страница 6: ...6 Specifications Figure 1 Instrument dimensions PHOSPHAX sc...

Страница 7: ...ecifications Figure 2 Instrument dimensions PHOSPHAX indoor sc 40 mm 1 57 in 237 mm 9 33 in 850 mm 33 15 in 1040 mm 4094 in 720 mm 28 35 in 540 mm 21 26 in 466 mm 18 11 in 390 mm 15 35 in 280 mm 11 02...

Страница 8: ...8 Specifications...

Страница 9: ...er than that specified in this manual 2 1 1 Use of hazard information DANGER Indicates a potentially or imminently hazardous situation which if not avoided will result in death or serious injury WARNI...

Страница 10: ...ndicates that a risk of electrical shock and or electrocution exists This symbol if noted on the product indicates the need for protective eye wear This symbol when noted on the product identifies the...

Страница 11: ...controller To convert the measured value of PO4 P to PO4 3 use the following conversion formula PO4 P x 3 07 PO4 3 The PHOSPHAX sc can operate using single or dual channel modes Operation with the Fil...

Страница 12: ...OSPHAX indoor sc enclosure 1 LED for operating state Refer to Table 7 on page 47 for more information 2 Door lock 3 Rating plate with model number serial number voltage and frequency information and p...

Страница 13: ...tive equipment suitable to the concentration and quantity of the dangerous material at the respective work place 3 1 Basic installation overview 1 Unpack the instrument section 3 2 2 Mount the instrum...

Страница 14: ...e sure that the fastening has sufficient load bearing capacity approximately 160 kg The wall plugs must be selected and approved to suit the properties of the wall Plan cable and tubing routes to avoi...

Страница 15: ...15 Installation 4 Attach the enclosure to the fastening bracket 5 Attach the angle bracket on the enclosure to the wall Figure 5 Bracket dimensions for wall mounting...

Страница 16: ...16 Installation Figure 6 Wall mounting the analyzer 1 Washer M5 4X 4 Screw customer supplied 2 Socket head cap screw M5 X 8 2X 5 Socket head cap screw M5 X 40 2X 3 Angle bracket 6 Fastening bracket...

Страница 17: ...The enclosure may tip forwards if it has not been fixed in place Only open the enclosure if the enclosure is properly mounted 1 Unlock the instrument item 4 Figure 7 item 3 Figure 8 2 Open the side l...

Страница 18: ...18 Installation Figure 8 Open the PHOSPHAX indoor sc enclosure 1 Latches 3 Lock with key 2 Door hook 1 3 2...

Страница 19: ...or the measuring unit is NOT a transport lock Do NOT remove the cover on the measuring unit 1 Open the enclosure door and secure with the door hook 2 Remove the transport lock on the analyzer panel Fi...

Страница 20: ...ove the compressor transport lock1 1 The compressor compressor transport lock and cable tie only apply to sc analyzers that operate using the Filter Probe sc 1 Compressor transport lock 4 Protective c...

Страница 21: ...een fixed in place Only open the enclosure if the enclosure is properly mounted 1 Open the enclosure door and secure with the door hook 2 Slide the collecting tray into the bottom of the enclosure Fig...

Страница 22: ...y open the enclosure if the enclosure is properly mounted 1 Remove power from the instrument 2 Open the enclosure door and secure with the door hook 3 Connect the humidity sensor wires to the terminal...

Страница 23: ...1 2 1 5 A 9 on page 74 2 FILTRAX 2 heated 2 2 2 6 A 10 on page 76 INDOOR Filter Probe sc Unheated 1 1 1 7 A 11 on page 78 FILTRAX Unheated 1 1 1 8 a A 12 on page 80 2 1 2 8 b A 13 on page 82 2 FILTRA...

Страница 24: ...s a qualified installation technician is installing wiring for the Filter Probe sc or the heated drain See Figure 14 for protective cover removal Figure 13 Sealing plug types 1 Sealing plug type 1 2 S...

Страница 25: ...accomplished by touching an earth grounded metal surface such as the chassis of an instrument or pipe or a metal conduit To reduce static build up avoid excessive movement Transport static sensitive...

Страница 26: ...earth ground green yellow wire item 9 Figure 16 on page 28 from the Filter Probe sc to the ground terminal item 5 Figure 16 on page 28 5 Connect the power connector to the appropriate terminal connect...

Страница 27: ...in 1 Open the enclosure door and secure with the door hook 2 Open the analyzer panel 3 Remove the protective cover Figure 14 on page 24 4 Connect the earth ground wire green yellow to the ground wire...

Страница 28: ...c ground wire 3 Heated drain optional power connector 10 Filter Probe sc data cable connector 4 Filter Probe sc power connector 11 Filter Probe sc power cable connector 5 Earth ground wire terminal st...

Страница 29: ...of the dangerous material at the respective work place CAUTION Avoid unnecessary contact with sample flows of unknown concentration as they can produce hazards due to trace chemicals radiation or bio...

Страница 30: ...30 Installation Figure 17 Chemicals and reagents in the PHOSPHAX sc section 8 1 on page 51 1 Connection to colorimeter detector 4 Reagent 2 Drain 5 Cleaning solution 3 Sample line...

Страница 31: ...must be provided between the mains connection of the sc1000 and the PHOSPHAX sc analyzer if it is demanded by the local regulation Only supply power to the instrument after all plumbing connections r...

Страница 32: ...data network Refer to the sc1000 controller user manual for more information on connecting the Data Network item 1 Figure 18 Figure 18 Connect the PHOSPHAX sc to the sc1000 power supply 1 Data networ...

Страница 33: ...ontroller to search for the analyzer Refer to the sc1000 user manual for more information 2 Configure the analyzer in the SENSOR SETUP menu and note the settings Refer to section 5 2 on page 35 for mo...

Страница 34: ...34 System Startup...

Страница 35: ...e used to slightly correct measurements which are close to Zero DEFAULT SETUP Resets the user editable options to their factory defaults CONFIGURE LOCATION 1 Settings for location 1 EDIT NAME Enter th...

Страница 36: ...asured value SET TRANSFER value to be entered TUBE HEATING ON Probe tube heating switches on at the start of the selected month With filtration probe OFF Probe tube heating switches off at the end of...

Страница 37: ...UAGE List of languages that are supported by the installed language package MEASURING DATA LOCATION1 GAIN CORR Indicates the correction factor set for correcting the measured values at measuring locat...

Страница 38: ...liquid in the collecting tray STATUS MODULES Only if filtration probe is registered shows status of filtration modules 0 100 PRESSURE P MIN Only if filtration probe is registered shows the averaged mi...

Страница 39: ...counter With filtration probe NEW MODULES Only if filtration probe is registered last filter module replacement PUMP MEMBRANE Only if filtration probe is registered date of the last pump membrane repl...

Страница 40: ...s to warm up to automatically initalize the measurment process This process takes approximately 15 minutes when the instrument temperature is 15 C 59 F Note Lower instrument temperatures prolong the w...

Страница 41: ...s material at the respective work place 6 1 General maintenance Regularly check the entire system for mechanical damage Regularly check all connections for leaks and corrosion Regularly check all cabl...

Страница 42: ...STATE 4 Change the air filter pads as described on the controller 5 Remove the fan locking screw and slide the retaining strap to the top and remove Figure 10 on page 20 If necessary press the fan do...

Страница 43: ...3 months 6 months 12 months 24 months Check measurement chamber and history of amplification event log X1 Visual check analytical compartment manual cleaning if necessary X1 X Check filter pads clean...

Страница 44: ...able measurement values close the door of the analyzer 8 Press ENTER to start the validation Note The remaining time is displayed in seconds 9 Press ENTER to escape The results are displayed to note d...

Страница 45: ...ost damage may occur Ensure that the instrument and tubing cannot freeze 1 Interrupt the measurement and switch the instrument to the service state 2 Isolate the analysis instrument from the controlle...

Страница 46: ...10 Depending on the duration remove the system from its mounting and wrap the system in a protective film or dry cloth Store the system in a dry place 6 5 Scheduled maintenance Table 5 lists items th...

Страница 47: ...oting the analyzer If the complete analysis instrument is not working check whether the humidity sensor has tripped Fix the damage dry the humidity sensor and restart the system If the problems still...

Страница 48: ...nd store the filter modules so that they remain moist See operating instructions for the filtration probe sc Reset error manually TEMPSENS DEFECT Service state fan running heating off The temperature...

Страница 49: ...mple tubing after start de frosting If there is a risk that the sample tubing is frozen a warning is displayed As far as possible wait until end of the warm up phase except if certain there is no fros...

Страница 50: ...ued measurement Amount of reagent has dropped below warning level set Check reagent level and replace if necessary then reset reagent level The level is indicated mathematically and can only function...

Страница 51: ...M3x50 2 LZY191 8 3 Mounting hardware Description Cat No Wall mount kit includes 4 screws 5 60 incl 4 anchors LZX355 Mounting kit for sc analyzer includes fastening angle bracket and screws LZY044 Set...

Страница 52: ...272 23 Upper part of valve block LZY174 24 Upper part of valve block with valve LZY175 25 Valve 2 2 ways LZY168 26 Tubing 3 2 mm 2 m sc analyzer LZY195 27 Set of fittings 3 2 mm 4 pieces LZY111 28 Fit...

Страница 53: ...Amplifier card for PHOSPHAX sc YAB045 58 Processor card for sc analyzer YAB099 59 Set of seals for PHOSPHAX sc measuring cell 4 O rings LZY197 60 Sealing for valve block LZY199 61 Sealing for overflo...

Страница 54: ...54 Replacement Parts and Accessories Exploded view drawings Figure 20 Analyzer enclosure PHOSPHAX sc...

Страница 55: ...55 Replacement Parts and Accessories Figure 21 Analyzer enclosure PHOSPHAX indoor sc...

Страница 56: ...56 Replacement Parts and Accessories Figure 22 Analyzer panel overview...

Страница 57: ...57 Replacement Parts and Accessories Figure 23 Analyzer panel front view details...

Страница 58: ...58 Replacement Parts and Accessories Figure 24 Analyzer panel back view details...

Страница 59: ...ax 32 0 15 41 61 20 info hach lange be www hach lange be DR LANGE NEDERLAND B V Laan van Westroijen 2a NL 4003 AZ Tiel Tel 31 0 344 63 11 30 Fax 31 0 344 63 11 50 info hach lange nl www hach lange nl...

Страница 60: ...HR 42 000 Vara din Tel 385 0 42 305 086 Fax 385 0 42 305 087 info hach lange hr www hach lange hr HACH LANGE MAROC SARLAU Villa 14 Rue 2 Casa Plaisance Quartier Racine Extension MA Casablanca 20000 T...

Страница 61: ...aused by any repair or attempted repair not authorized by Hach Company Any product not used in accordance with the instructions furnished by Hach Company Freight charges to return merchandise to Hach...

Страница 62: ...62 Limited Warranty...

Страница 63: ...ld be performed with power removed Delicate internal electronic components can be damaged by static electricity resulting in degraded instrument performance or eventual failure The manufacturer recomm...

Страница 64: ...ructions to connect a 2 parameter configuration 1 Remove the small blind plug item 1 Figure 25 from the top hole on the overflow vessel Remove the large fitting item 2 from the bottom hole on the over...

Страница 65: ...the drain tube assembly 3 Reconnect the T fitting as described in Options 4 6 8b 9b 10b and 11b A 3 Drain line considerations Always place the drain tubing so that there is a continuous fall minimum 3...

Страница 66: ...for Option 1 1 Install the Filter Probe sc into the sample stream Refer to the Filter Probe sc User Manual for more information 2 Feed the Filter Probe sc hose sample lines electrical cables and drain...

Страница 67: ...umbing and connection options Figure 27 Option 1 setup 1 PHOSPHAX sc analyzer 5 Filter Probe sc hose 2 AMTAX sc analyzer 6 Seal plug 2 3 Air tube 7 Sample line to overflow vessel 4 Seal plug 3 8 Drain...

Страница 68: ...the analyzer opening Figure 28 item 9 Use Seal Plug 2 to secure Note The drain tube from the Filter Probe sc is not used 3 Feed the heated drain hose through the analyzer opening item 7 Use Seal Plug...

Страница 69: ...1 PHOSPHAX sc analyzer 7 Heated drain tube 2 AMTAX sc analyzer 8 Seal plug 1 3 Unused heated drain sample lines 9 Filter Probe sc hose 4 Unused Filter Probe sc drain tube 10 Seal plug 2 5 Air tube 11...

Страница 70: ...into the sample stream Refer to the FILTRAX User Manual for more information 2 Feed the heated hose from the FILTRAX through the analyzer opening Figure 29 item 5 Use Seal Plug 1 to secure 3 Feed the...

Страница 71: ...g and connection options Figure 29 Option 3 setup 1 Unused heated drain sample lines 5 FILTRAX heated hose 2 Seal plug 3 6 Seal plug 1 3 Heated drain hose 7 FILTRAX sample line 4 Seal plug 1 8 Heated...

Страница 72: ...ove the T fitting from the drain tube item 7 Retain for reuse with Analyzer 2 f Connect the heated drain tube to the valve block connector g Connect the sample line from the FILTRAX to the bottom inle...

Страница 73: ...zer 1 16 Seal plug 1 3 Seal plug 1 10 Sample line from analyzer 1 17 Heated drain hose 4 Seal plug 3 11 Heated drain hose 18 Seal plug 3 5 Unused heated drain sample lines 12 Heated drain hose from an...

Страница 74: ...on 2 Feed the heated hose from FILTRAX 1 through the analyzer opening Figure 31 item 7 Use Seal Plug 1 to secure 3 Feed the heated hose from FILTRAX 2 through the analyzer opening item 6 Use Seal Plug...

Страница 75: ...tup 1 FILTRAX 1 7 FILTRAX heated hose 1 2 FILTRAX 2 8 Heated drain tube 3 Seal plug 1 9 FILTRAX 2 sample line 4 Unused heated drain sample lines 10 FILTRAX 1 sample line 5 Heated drain hose 11 Overflo...

Страница 76: ...r f Connect the sample line from FILTRAX 1 to the bottom inlet on Overflow Vessel 1 using the fittings item 20 g Connect the sample line from FILTRAX 2 to the bottom inlet on Overflow Vessel 2 using t...

Страница 77: ...e line 4 FILTRAX 2 14 Heated drain sample 2 from analyzer 1 24 Heated drain 2 sample line 5 Seal plug 1 15 Heated drain sample 1 from analyzer 1 25 FILTRAX 1 heated hose 6 Seal plug 3 16 Overflow vess...

Страница 78: ...ll the Filter Probe sc into the sample stream Refer to the Filter Probe sc User Manual for more information 2 Feed the Filter Probe sc hose sample lines electrical cables drain tube through the analyz...

Страница 79: ...ion options Figure 33 Option 7 setup 1 PHOSPHAX sc analyzer 6 Filter Probe sc hose 2 AMTAX sc analyzer 7 Seal plug 2 3 Unused Filter Probe sc drain tube 8 Sample line to overflow vessel 4 Air tube 9 D...

Страница 80: ...he FILTRAX User Manual for more information 2 Feed the heated hose from the FILTRAX through the analyzer opening Figure 34 item 3 Use Seal Plug 1 to secure 3 Feed the drain tube through the analyzer o...

Страница 81: ...81 Plumbing and connection options Figure 34 Option 8a setup 1 Seal plug 3 2 Seal plug 1 3 FILTRAX heated hose 4 FILTRAX sample line 5 Drain tube Feed to a lower drain maximum 2 m 6 5 ft...

Страница 82: ...er to the 2 parameter configuration Refer to 2 parameter configuration on page 64 d Connect the reworked overflow of the overflow vessel to deliver the sample to Analyzer 2 e Feed the overflow vessel...

Страница 83: ...FILTRAX sample line 2 AMTAX sc analyzer 8 FILTRAX heated hose 3 Seal plug 3 9 Seal plug 1 4 Sample line from analyzer 1 maximum 2 m 6 5 ft 10 Seal plug 3 5 Drain tube Feed to a lower drain maximum 2 m...

Страница 84: ...sample stream Refer to the FILTRAX User Manual for more information 2 Feed the heated hose from FILTRAX 1 through the analyzer Figure 36 item 6 Use Seal Plug 1 to secure 3 Feed the heated hose from F...

Страница 85: ...9a setup 1 FILTRAX 1 5 FILTRAX 2 heated hose 9 FILTRAX 1 sample line 2 FILTRAX 2 6 FILTRAX 1 heated hose 10 Overflow vessel 1 3 Seal plug 1 7 Drain tube Feed to a lower drain maximum 2 m 6 5 ft 11 Ove...

Страница 86: ...Remove the drain tube with the T fitting from the valve block connector e Connect the drain tube to the valve block connector f Connect the sample line from FILTRAX 1 to the bottom inlet on Overflow V...

Страница 87: ...tube 3 AMTAX sc analyzer 10 Overflow vessel 2 17 Overflow vessel 2 tube 4 FILTRAX 2 11 Drain tube Feed to a lower drain maximum 2 m 6 5 ft 18 FILTRAX 1 heated hose 5 Seal plug 3 12 FILTRAX 2 sample li...

Страница 88: ...ions for Option 10a 1 Install the sample preparation unit 2 Feed the sample line from the sample preparation unit through the analyzer Figure 38 item 2 Use Seal Plug 3 to secure 3 Feed the drain tube...

Страница 89: ...89 Plumbing and connection options Figure 38 Option 10a setup 1 Seal plug 3 2 Sample line 3 Drain tube Feed to a lower drain maximum 2 m 6 5 ft...

Страница 90: ...m 7 Use Seal Plug 3 to secure b Feed the drain tube through the analyzer item 6 Use Seal Plug 3 to secure c Remove the drain tube from the valve block connector d Connect the sample line from the samp...

Страница 91: ...b setup 1 PHOSPHAX sc analyzer 4 Sample line from analyzer 1 7 Sample line 2 AMTAX sc analyzer 5 Drain tube Feed to a lower drain maximum 2 m 6 5 ft 8 Seal plug 3 3 Seal plug 3 6 Drain tube Feed to a...

Страница 92: ...from each sample preparation unit through the analyzer Use Seal Plug 3 to secure 3 Feed the drain tube through the analyzer using Seal Plug 3 Figure 40 item 2 Note Tubes can be pushed through prepared...

Страница 93: ...nd connection options Figure 40 Option 11a setup 1 Seal plug 3 3 Sample line preparation 2 5 Overflow vessel 1 2 Drain tube Feed to a lower drain maximum 2 m 6 5 ft 4 Sample line preparation 1 6 Overf...

Страница 94: ...ting from the valve block connector Connect the drain tube to the valve block connector Discard the T fitting e Connect Sample Line 1 from Sample Preparation Unit 1 to the bottom inlet on Overflow Ves...

Страница 95: ...alyzer 2 overflow vessel 1 3 Seal plug 3 9 Drain tube Feed to a lower drain maximum 2 m 6 5 ft 15 Sample line to analyzer 2 overflow vessel 2 4 Drain tube Feed to a lower drain maximum 2 m 6 5 ft 10 S...

Страница 96: ...96 Plumbing and connection options...

Страница 97: ...cesses like cleaning are interrupted by a forced measurement The interrupted process will be started again after the forced measurement A discharged value will be discarded before the measurement A fo...

Страница 98: ...ll be interrupted from measurement series The interrupted process will start again after the end of the measurement series To use the START BY BUS feature the sample has to be available at any time fo...

Страница 99: ...eger 1 R 0 100 percentage of cooling fan power HEATING 40028 Unsigned Integer 1 R 0 1 status off heating for sample tube 0 OFF 1 ON HUMIDITY PROBE 40029 Unsigned Integer 1 R 0 100 humitity filtration...

Страница 100: ...gister to start a bus action see Field bus control BUS ANALY START 40072 Unsigned Integer 1 R W 0 1 you can start the analyzer about the bus BUS SERVICE 40073 Unsigned Integer 1 R W 0 1 you can start...

Страница 101: ...21 22 23 measuring intervall 0 5 minutes 1 10minutes 2 15 minutes to 23 120 minutes 33 3h 45 4h 57 5h 69 6h 81 7h 93 8h 105 9h 117 10h 129 11h 141 12h 153 13h 165 14h 177 15h 189 16h 201 17h 213 18h 2...

Страница 102: ...R W The number of measurement values that result in an average value in a START BY BUS measurement series NO OF VALUES CH1 40135 Unsigned Integer 1 R W 0 100 2 channel mode how often is channel 1 meas...

Страница 103: ...of the last correction factor for channel one LAST CHA FACTOR2 40200 Time2 2 R the date of the last correction factor for channel two SAMPLE DETECTION 40211 Unsigned Integer 1 R W 0 1 2 output if samp...

Страница 104: ...the analyzer during the last 24 hours intervall starts with power on ENCLOSU TEMP MAX 40275 Float 2 R 50 200 0 the maximum temperature inside the analyzer during the last 24 hours intervall starts wit...

Отзывы: