35
Troubleshooting
6.3.2 Optimize the pump
To optimize the pump:
1.
After the assembly of the pump, loosen the set screw plug in the bracket. Connect
the set screw plug to the MET ONE 227 particle counter.
2.
Turn on power to the MET ONE 227 particle counter.
3.
Press
1 (RUN)
to initiate a count cycle and turn on the pump.
4.
Hold the pump motor still.
5.
Rotate the entire pump head in a 180° arc (refer to
).
6.
As the pump head is rotated listen for the point where the Revolutions per Minute
(RPMs) are the greatest.
7.
Keep the pump head steady and tighten the set screw.
Figure 34 Rotation of the pump head
Содержание MET ONE 227
Страница 3: ......
Страница 7: ...6 Specifications ...
Страница 15: ...14 Installation ...
Страница 31: ...30 Maintenance ...
Страница 37: ...36 Troubleshooting ...
Страница 43: ...42 Certification ...
Страница 47: ...46 ...
Страница 55: ......