Habasit Italiana S.p.A.
Vittorio Veneto 31029 (TV)
Tel.: ++39(0)438.9113
Fax. ++39(0)438.200545
Hot Press PM-1306
Author:
S.D.T. / KM
INSTALLATION
Edition: 02/2005
Page
C-6
Replaces: 01/2002
Make the necessary water connections between the cooling unit
PMC-XX
and the joining press.
Make the necessary water and air connections between the water supply and the cooling unit
PMC-XX.
Ensure the water connections are well sealed and that any leaks that could occur do not come into
contact with electrical parts.
Mobile operation
Running the system in its mobile operation requires the use of suitable equipment (such as a portable
compressor for the air supply and a water tank with immersion pump or available running water).
Ensure that the whole system is not supplied by electrical, air and water sources.
Ensure all the plant providing the equipment corresponds with its own specifications.
Use the pneumatic connection kit (code 008E1000), to connect the pressure cushions of the upper and
lower press parts.
Ensure the water connections are well sealed and that any leaks that could occur do not come into
contact with electrical parts.
C.3.3
Electrical connection
ATTENTION
Ensure that the whole system is not supplied by electrical, air and water sources.
Ensure all the plant providing the equipment corresponds with its own specifications.
The electrical power parts (and water and air supply logic systems) are managed by the regulating unit
PMR-XX
. Referring to
Section B.4.3 Regulating unit options
ensure the regulating unit is suitable for the
hot-pressing device actually used.
Connect the hot-pressing device's connectors to the regulating unit
PMR-XX
.
If present carry out the necessary connections between the regulating unit
PMR-XX
and the cooling unit
PMC-XX
.
Connect the regulating unit
PMR-XX
to the mains electrical supply (see manual
PMR-XX
).
NOTE
The use of a regulating unit is necessary both for stationary operation and for mobile operation.
Hot-pressing device PM-1306