![H3C S12508CR Скачать руководство пользователя страница 28](http://html1.mh-extra.com/html/h3c/s12508cr/s12508cr_installation-quick-start_3583255028.webp)
25
4
Cabling recommendations
The cable management brackets are installed at the two sides of the chassis front panel. As a best
practice, route network cables from the left and right sides, as shown in
Figure 4-1 Routing cables
25
4
Cabling recommendations
The cable management brackets are installed at the two sides of the chassis front panel. As a best
practice, route network cables from the left and right sides, as shown in
Figure 4-1 Routing cables