
1-9
CAUTION:
•
To avoid device damage, move the carton to a location close to the installation site before
unpacking it.
•
Do not place the carton upside down.
•
If you find the router water-soaked or its surface rusted, stop unpacking it and contact the
equipment supplier.
•
Use a mechanical lift to move the shipping pallet and keep the router upright during the moving
process.
•
If no mechanical lift is used, cooperate with a minimum of four people to move the chassis by
using the chassis handles.
•
When transporting, moving, and installing the chassis, be careful not to bump the router into the
door or wall.
To unpack the chassis:
1.
Place the carton flat on the floor with the pallet at the bottom.
2.
Use scissors or diagonal pliers to cut the straps on the carton.
Figure1-4 Cutting the strap on the carton
3.
Lift the top cap from the carton, take out the accessory box, and remove the packaging
materials such as the packaging carton and foam cushion.
Verify that the accessory box package is intact. Check the accessories against the packing list.
Содержание CR19000-8
Страница 10: ...1 4 Figure1 1 Chassis dimensions Figure1 2 Rack requirements ...
Страница 41: ...3 6 Figure3 6 Connecting an AC power cord ...
Страница 52: ...4 10 Figure4 12 Installing an interface subcard ...
Страница 115: ...12 7 Figure12 5 Putting the foam cusion and carton top cover in place ...