3. INSTALLATION
3-
3.5. INSTALLATION AND LEVELLING
Install this machine on a solid and level concrete floor. Leave proper space around the
machine for handling the materials to be machined. Four steel pads are furnished with
the machine, which are to be placed under the levelling screws at the four corners.
After the machine has been located at a proper work site, proper leveling needs to be
made. The following steps should be taken:
1.
Place the steel pads (A) under the levelling screws (B).
2.
Place a precision level gauge (C) on the table at infeed end, outfeed end and
middle position.
3.
Adjust the leveling screws until proper leveling is obtained.