STEP II
a)
Place the machine guides (5) between the main frame connection plates (1) and
the mounting plates of the machine base (2). Align the axes of the guide holes
and plates. Fasten with M12x40 screws and M12 washers. Slide the washer
onto the fixing screw. Guide it through the axes of the holes, tighten firmly.
b)
Fix the training load holder (13) to the feeder (12). Secure on both sides with
M12x60 screws, M12 washers and M12 nuts.
Содержание GR-MG 50
Страница 8: ......
Страница 9: ...SCHRITT I...
Страница 20: ......
Страница 21: ...STEP I...
Страница 24: ...c Place the feeder 12 on the guides 5 Lock with M12x90 screws and M12 washers STEP III...
Страница 32: ......
Страница 33: ...KROK I...
Страница 36: ...c Suwnic 12 osadzi na prowadnicach 5 Zablokowa przy pomocy rub M12x90 oraz podk adek M12 KROK III...
Страница 44: ......
Страница 45: ...KROK I...
Страница 48: ...c Um st te je b 12 na vod tka 5 Upevn te pomoc roub M12x90 a podlo ek M12 KROK III...
Страница 56: ......
Страница 57: ...TAPE I...
Страница 60: ...c Placer la grue 12 sur les guides 5 Serrure avec boulons M12x90 et rondelles M12 TAPE III...
Страница 68: ......
Страница 69: ...PASSO I...
Страница 72: ...c Posizionare la gru 12 sulle guide 5 Bloccare con le viti M12x90 e le rondelle M12 PASSO III...
Страница 80: ......
Страница 81: ...PASO I...
Страница 84: ...c Colocar la gr a 12 sobre las gu as 5 Bloquear con tornillos M12x90 y arandelas M12 PASO III...
Страница 92: ......
Страница 93: ...1 L P S...
Страница 96: ...c A darut 12 ltesse r a s nekre 5 Z rolja M12x90 csavarokkal s M12 al t tekkel 3 L P S...
Страница 104: ......
Страница 105: ...TRIN I...
Страница 108: ...c Placer broen 12 p vangerne 5 L s med M12x90 skruer og M12 skiver TRIN III...