15
©
Guldmann
G
B
-1
25
5/
08
/0
9
•
#
944120
©
Guldmann
G
B
-1
25
5/
08
/0
9
•
#
944120
©
Guldmann
G
B
-1
25
5/
08
/0
9
•
#
944120
©
Guldmann
G
B
-1
25
5/
08
/0
9
•
#
944120
2 Lifting motor/actuator
• Check spline ring integrity, lifting the boom gently until end stop is detected.
• According to the manufacturer’s instructions the lifting motor/actuator
shall be exchanged after 11.000 cycles or at least every 5 years.
3 Test of the product, as during normal use
• Check all functions on the product, with and without load,
(Ie. Up, down, forward, backward, out and in).
• Check the emergency lowering is operational.
• Check the emergency stop is operational.
• Check the charging indicator is operational.
4 Dismantle the cover/fence
5 Check the electrical condition of the products
• Check the batteries and measure the:
• Input/Voltage
• Output/Voltage
• Check electrical functions and signals
• Check all wirings for errors and defects
• Check wire lead-ins
• Check all possible conections, plugs etc.
6 Check the mechanical condition oft the product
• Clean the product for dirt and other impurities
• Inspect and evaluate the vital parts of the product
• Exchange defective and worn parts of the product
• Check and tighten all moving parts
• Grease the product.
7 Mount the cover/fence
8 Point 3 is carried out one more time as a control function
9 Have new errors or problems arisen in point 7?
• If new problems have arisen, go back to point 3
• If no problems have arisen, finish the inspection.
10 When a service inspection including service work or exchange of com-
ponents has taken place, the final check should comprise a weight test
with the product’s nominal load .
Содержание GL2
Страница 1: ...GB Guldmann mobile lifter Vers 2 00 ...
Страница 19: ...19 ...