background image

INSPECTION DATE:____________ (Mark date of inspection) 
 
INSPECTION ITEMS NOTED:  (Refer to inspection guidelines in this manual) 
1.  

 

2. 
3. 
4. 
5. 
 
CORRECTIVE ACTION TAKEN: _________________________________________  

 

 
APPROVED BY:____________________________  DATE: ____________  (Who approved inspection and 
corrective action taken) 
 
 
 
 
INSPECTION DATE:____________ (Mark date of inspection) 
 
INSPECTION ITEMS NOTED:  (Refer to inspection guidelines in this manual) 
1.  

 

2. 
3. 
4. 
5. 
 
CORRECTIVE ACTION TAKEN: _________________________________________  
 
APPROVED BY:____________________________  DATE: ____________  (Who approved inspection and 
corrective action taken) 
 
 
 
 
INSPECTION DATE:____________ (Mark date of inspection) 
 
INSPECTION ITEMS NOTED:  (Refer to inspection guidelines in this manual) 
1.  

 

2. 
3. 
4. 
5. 
 
CORRECTIVE ACTION TAKEN: _________________________________________  
 
APPROVED BY:____________________________  DATE: ____________  (Who approved inspection and 
corrective action taken) 
 
 
 
 
 

Содержание 10917

Страница 1: ...r each employee who might be exposed to fall hazards The program shall enable each employee to recognize the hazards of falling and shall train each employee in the procedures to be followed in order...

Страница 2: ...16th galvanized or stainless wire cable SRL also comes with a carabineer and tag line to be used with the device to avoid improper use PRODUCT APPLICATION INFORMATION The SRL is used in a stationary o...

Страница 3: ...OSHA and ANSIZ359 1 standards when used properly and in accordance with manufacturer s instructions LIMITATIONS CONTINUED Swing Falls Swing falls occur when the anchorage point is not directly above...

Страница 4: ...an anchorage point capable of support at least 5 000 lbs Additionally select a location for anchorage of the SRL that will avoid a free fall and swing fall hazards To prevent an increased free fall d...

Страница 5: ...rd the serial number information from the label in the inspection and maintenance log at the end of this manual Annually ANSI requires a formal inspection of the SRL be completed by a competent person...

Страница 6: ...e ep pe ea at te ed d o on n a a p pe er ri io od di ic c b ba as si is s i in n a ac cc co or rd da an nc ce e w wi it th h y yo ou ur r o or rg ga an ni iz za at ti io on ns s p po ol li ic cy y a a...

Страница 7: ...ua ar rd di ia an n F Fa al ll l P Pr ro ot te ec ct ti io on n S St ta an nd di in ng g S Se ea am m R Ro oo of f A An nc ch ho or r 0 00 02 25 50 0 A Ar rm ma ad di il ll lo o 0 00 02 24 45 5 o or r...

Страница 8: ...l ly y i in ns sp pe ec ct ti io on n o of f t th he e s sh ho oc ck k a ab bs so or rb bi in ng g d de ev vi ic ce e i is s r re eq qu ui ir re ed d T Th he e s sh ho oc ck k p pa ac ck k h ha as s a...

Страница 9: ...MK Series Instruction Label...

Страница 10: ...___________________ INSPECTION DATE ____________ Mark date of inspection INSPECTION ITEMS NOTED Refer to inspection guidelines in this manual 1 2 3 4 5 CORRECTIVE ACTION TAKEN ________________________...

Страница 11: ...NSPECTION ITEMS NOTED Refer to inspection guidelines in this manual 1 2 3 4 5 CORRECTIVE ACTION TAKEN _________________________________________ APPROVED BY ____________________________ DATE __________...

Страница 12: ...NSPECTION ITEMS NOTED Refer to inspection guidelines in this manual 1 2 3 4 5 CORRECTIVE ACTION TAKEN _________________________________________ APPROVED BY ____________________________ DATE __________...

Страница 13: ...NSPECTION ITEMS NOTED Refer to inspection guidelines in this manual 1 2 3 4 5 CORRECTIVE ACTION TAKEN _________________________________________ APPROVED BY ____________________________ DATE __________...

Страница 14: ..._________________ APPROVED BY ____________________________ DATE ____________ Who approved inspection and corrective action taken G Gu ua ar rd di ia an n F Fa al ll l P Pr ro ot te ec ct ti io on n I...

Отзывы: