background image

WARNING! 

 

PLAN THE FALL PROTECTION SYSTEM:

 

Before installation plan your system.  Consider all factors that will affect your safety during use of this equipment.  The following 
list gives important points to consider when planning your system: 
 

ƒ

 

Anchorage:  Select a rigid anchorage capable of supporting the loads no less than 5,000 lbs. per worker attached. 

ƒ

 

Sharp Edges:  Avoid working where system components may be in contact with, or abrade against, unprotected sharp edges. 

ƒ

 

After a Fall:  Components which have been subjected to the forces of arresting a fall must be removed from service and 
destroyed.  Retractable must be returned for servicing to GFP or an authorized repair center. 

ƒ

 

Rescue:  The employer must have a rescue plan when using this equipment.  The employer must have the ability to perform a 
rescue quickly and safely.   

 

 

WARNING! 

 

 

I

I

f

f

 

 

i

i

n

n

s

s

p

p

e

e

c

c

t

t

i

i

o

o

n

n

 

 

r

r

e

e

v

v

e

e

a

a

l

l

s

s

 

 

a

a

n

n

 

 

u

u

n

n

s

s

a

a

f

f

e

e

 

 

o

o

r

r

 

 

d

d

e

e

f

f

e

e

c

c

t

t

i

i

v

v

e

e

 

 

c

c

o

o

n

n

d

d

i

i

t

t

i

i

o

o

n

n

,

,

 

 

r

r

e

e

m

m

o

o

v

v

e

e

 

 

t

t

h

h

e

e

 

 

S

S

e

e

l

l

f

f

 

 

R

R

e

e

t

t

r

r

a

a

c

c

t

t

i

i

n

n

g

g

 

 

L

L

i

i

f

f

e

e

l

l

i

i

n

n

e

e

 

 

f

f

r

r

o

o

m

m

 

 

s

s

e

e

r

r

v

v

i

i

c

c

e

e

 

 

a

a

n

n

d

d

 

 

s

s

e

e

n

n

d

d

 

 

b

b

a

a

c

c

k

k

 

 

t

t

o

o

 

 

G

G

u

u

a

a

r

r

d

d

i

i

a

a

n

n

 

 

F

F

a

a

l

l

l

l

 

 

P

P

r

r

o

o

t

t

e

e

c

c

t

t

i

i

o

o

n

n

 

 

o

o

r

r

 

 

a

a

n

n

 

 

a

a

u

u

t

t

h

h

o

o

r

r

i

i

z

z

e

e

d

d

 

 

r

r

e

e

p

p

a

a

i

i

r

r

 

 

c

c

e

e

n

n

t

t

e

e

r

r

.

.

 

 

WARNING! 

 

 

T

T

r

r

a

a

i

i

n

n

i

i

n

n

g

g

 

 

s

s

h

h

o

o

u

u

l

l

d

d

 

 

b

b

e

e

 

 

c

c

o

o

n

n

d

d

u

u

c

c

t

t

e

e

d

d

 

 

w

w

i

i

t

t

h

h

o

o

u

u

t

t

 

 

e

e

x

x

p

p

o

o

s

s

i

i

n

n

g

g

 

 

a

a

n

n

y

y

o

o

n

n

e

e

 

 

t

t

o

o

 

 

a

a

 

 

f

f

a

a

l

l

l

l

 

 

h

h

a

a

z

z

a

a

r

r

d

d

.

.

 

 

 

 

T

T

r

r

a

a

i

i

n

n

i

i

n

n

g

g

 

 

s

s

h

h

o

o

u

u

l

l

d

d

 

 

b

b

e

e

 

 

r

r

e

e

p

p

e

e

a

a

t

t

e

e

d

d

 

 

o

o

n

n

 

 

a

a

 

 

p

p

e

e

r

r

i

i

o

o

d

d

i

i

c

c

 

 

b

b

a

a

s

s

i

i

s

s

 

 

i

i

n

n

 

 

a

a

c

c

c

c

o

o

r

r

d

d

a

a

n

n

c

c

e

e

 

 

w

w

i

i

t

t

h

h

 

 

y

y

o

o

u

u

r

r

 

 

o

o

r

r

g

g

a

a

n

n

i

i

z

z

a

a

t

t

i

i

o

o

n

n

s

s

 

 

p

p

o

o

l

l

i

i

c

c

y

y

 

 

a

a

n

n

d

d

 

 

c

c

o

o

m

m

p

p

l

l

i

i

a

a

n

n

c

c

e

e

 

 

w

w

i

i

t

t

h

h

 

 

O

O

S

S

H

H

A

A

 

 

r

r

e

e

g

g

u

u

l

l

a

a

t

t

i

i

o

o

n

n

s

s

.

.

 

 

 
 
 

 
 
 
 
 
 
 
 
 
 
 
 
 
INSTALLATION REQUIREMENTS: 

The following requirements outline the proper installation procedures to be followed. 
 

Location: 
 

ƒ

 

Select a location on an appropriate strength anchorage that will provide overall safety and proper loading.  The anchorage 
must be free of deformities or defects that may weaken the structure.  The anchorage to which the SRL is attached must be 
capable of sustaining static loads in the directions applied by the personal fall arrest systems of at least 3,600lbs with 
certification of a qualified person, or 5,000lbs without certification.

 

ƒ

 

When more than one person is attached to the same structure, the strength requirements stated above must be multiplied by 
the number of personal fall arrest systems.

 

ƒ

 

Do not work above the anchorage point.  While using an SRL, always ensure that there is constant tension on the cable.  
Slack in the cable could result in an increase in fall distance.  Move normally as sudden jerky movements will allow the 
locking mechanism to engage.  

 

ƒ

 

Do not install in an area where a swing fall hazard potentially could exist.  Failure to do so could result in injury or 
possibly death.   

ƒ

 

Keep these instructions for reference. 

 

 
 
 
 
 
 

 
 
 
 

 

 

TRAINING: 

It is the responsibility of the user and the purchaser of this equipment to assure that they are familiar with these instructions, 
trained in the correct care and use of, and are aware of the operating characteristics, application limits, and the consequences of 
improper use of this equipment. 
 
 

 
 
 
 
 
 

 
 
 
 
 
 
 

Содержание 10917

Страница 1: ...r each employee who might be exposed to fall hazards The program shall enable each employee to recognize the hazards of falling and shall train each employee in the procedures to be followed in order...

Страница 2: ...16th galvanized or stainless wire cable SRL also comes with a carabineer and tag line to be used with the device to avoid improper use PRODUCT APPLICATION INFORMATION The SRL is used in a stationary o...

Страница 3: ...OSHA and ANSIZ359 1 standards when used properly and in accordance with manufacturer s instructions LIMITATIONS CONTINUED Swing Falls Swing falls occur when the anchorage point is not directly above...

Страница 4: ...an anchorage point capable of support at least 5 000 lbs Additionally select a location for anchorage of the SRL that will avoid a free fall and swing fall hazards To prevent an increased free fall d...

Страница 5: ...rd the serial number information from the label in the inspection and maintenance log at the end of this manual Annually ANSI requires a formal inspection of the SRL be completed by a competent person...

Страница 6: ...e ep pe ea at te ed d o on n a a p pe er ri io od di ic c b ba as si is s i in n a ac cc co or rd da an nc ce e w wi it th h y yo ou ur r o or rg ga an ni iz za at ti io on ns s p po ol li ic cy y a a...

Страница 7: ...ua ar rd di ia an n F Fa al ll l P Pr ro ot te ec ct ti io on n S St ta an nd di in ng g S Se ea am m R Ro oo of f A An nc ch ho or r 0 00 02 25 50 0 A Ar rm ma ad di il ll lo o 0 00 02 24 45 5 o or r...

Страница 8: ...l ly y i in ns sp pe ec ct ti io on n o of f t th he e s sh ho oc ck k a ab bs so or rb bi in ng g d de ev vi ic ce e i is s r re eq qu ui ir re ed d T Th he e s sh ho oc ck k p pa ac ck k h ha as s a...

Страница 9: ...MK Series Instruction Label...

Страница 10: ...___________________ INSPECTION DATE ____________ Mark date of inspection INSPECTION ITEMS NOTED Refer to inspection guidelines in this manual 1 2 3 4 5 CORRECTIVE ACTION TAKEN ________________________...

Страница 11: ...NSPECTION ITEMS NOTED Refer to inspection guidelines in this manual 1 2 3 4 5 CORRECTIVE ACTION TAKEN _________________________________________ APPROVED BY ____________________________ DATE __________...

Страница 12: ...NSPECTION ITEMS NOTED Refer to inspection guidelines in this manual 1 2 3 4 5 CORRECTIVE ACTION TAKEN _________________________________________ APPROVED BY ____________________________ DATE __________...

Страница 13: ...NSPECTION ITEMS NOTED Refer to inspection guidelines in this manual 1 2 3 4 5 CORRECTIVE ACTION TAKEN _________________________________________ APPROVED BY ____________________________ DATE __________...

Страница 14: ..._________________ APPROVED BY ____________________________ DATE ____________ Who approved inspection and corrective action taken G Gu ua ar rd di ia an n F Fa al ll l P Pr ro ot te ec ct ti io on n I...

Отзывы: