background image

   

G

ua

rd

ia

Fa

ll 

Pr

ot

ec

tio

  6

30

S.

 2

31

st

 S

t.

, K

en

t,

 W

A

 9

80

32

   

   

 p

ho

ne

: (

80

0)

 4

66

-6

38

 f

ax

: (

80

0)

 6

70

-7

89

   

  w

w

w

.g

ua

rd

ia

nf

al

l.c

om

5

Maintenance, Cleaning, and Storage

If Drop Through Anchor fails inspection in any way, immediately remove it from service, and contact Guardian
to inquire about its return or repair.

Cleaning after use is important for maintaining the safety and longevity of Drop Through Anchor. Remove all
dirt, corrosives, and contaminants from Drop Through Anchor before and after each use. If Drop Through
Anchor cannot be cleaned with plain water, use mild soap and water, then rinse and wipe dry. NEVER clean
Drop Through Anchor with corrosive substances.

When not in use, store equipment where it will not be affected by heat, light, excessive moisture, chemicals,
or other degrading elements.

Prior to EACH use, inspect Drop Through Anchor for deficiencies, including, but not limited to, corrosion,
deformation, pits, burrs, rough surfaces, sharp edges, cracking, rust, paint buildup, excessive heating,
alteration, and missing or illegible labels. IMMEDIATELY remove Drop Through Anchor from service if defects or
damage are found, or if exposed to forces of fall arrest.

Ensure that applicable work area is free of all damage, including, but not limited to, debris, rot, rust, decay,
cracking, and hazardous materials. Ensure that selected work area will support the application-specific
minimum loads set forth in this instruction manual. Work area MUST be stable.

At least every 6 months, a Competent Person other than the user must inspect Drop Through Anchor.

Competent Person inspections MUST be recorded in inspection log in instruction manual and on
equipment inspection grid label. The Competent Person must sign their initials in the box
corresponding to the month and year the inspection took place.

During inspection, consider all applications and hazards Drop Through Anchor have been subjected to.

Inspection

Inspection Log

If equipment fails inspection IMMEDIATELY REMOVE FROM SERVICE.

Date of First Use: __________________.

Product lifetime is indefinite as long as it passes pre-use and Competent Person inspections. User must
inspect prior to EACH use. Competent Person other than user must complete formal inspection at least
every 6 months. Competent Person to inspect and initial.

This inspection log must be specific to one Drop Through Anchor. Separate inspection logs must be used
for each Drop Through Anchor. All inspection records must be made visible and available to all users at
all times.

Содержание 00516

Страница 1: ...nderstand these instructions before using equipment Introduction 1 Applicable Safety Standards 1 Worker Classifications 1 Safety Information 6 Product Specific Applications 1 2 Limitations 2 3 Components and Specifications 3 4 Maintenance Cleaning and Storage 5 Inspection 5 Installation and Use 4 Inspection Log 5 Labels 7 ...

Страница 2: ...erience or sufficient professional standing who is considered proficient in planning and reviewing the conformity of fall protection and rescue systems Competent Person A highly trained and experienced person who is ASSIGNED BY THE EMPLOYER to be responsible for all elements of a fall safety program including but not limited to its regulation management and application A person who is proficient i...

Страница 3: ... to arrest a fall before the user strikes the ground or an obstruction When calculating fall clearance account for a MINIMUM 3 safety factor deceleration distance user height length of lanyard SRL harness stretch and all other applicable factors Diagram shown is an example fall clearance calculation ONLY Swing Falls Prior to installation or use make considerations for eliminating or minimizing all...

Страница 4: ...oof Edge Either Direction X Working Angle From Perpendicular Ø 6 10 15 20 25 30 35 40 45 50 55 60 8 9 9 11 7 13 3 14 6 16 17 2 18 3 19 4 19 10 21 4 22 3 53 45 38 33 30 28 26 24 23 21 21 21 For example if the anchorage connector is 6 from the leading edge Y the working distance X is 8 in each direction from the perpendicular which translates to a 53 working angle Connection Point Cable Anchor Plate...

Страница 5: ... installed Cable Anchor Plate must lie flush with substrate 5 Make considerations for eliminating or minimizing swing fall hazards Minimum substrate requirements Concrete 4 thick and 3 000 PSI Never install into wet or uncured concrete DO NOT install onto wood or metal substrates Installation 1 If necessary drill 1 75 diameter hole at selected installation location 2 Pass Drop Through Anchor Conne...

Страница 6: ...fall arrest Ensure that applicable work area is free of all damage including but not limited to debris rot rust decay cracking and hazardous materials Ensure that selected work area will support the application specific minimum loads set forth in this instruction manual Work area MUST be stable At least every 6 months a Competent Person other than the user must inspect Drop Through Anchor Competen...

Страница 7: ...LE SRLs Class A SRLs must arrest falls within 24 Class B SRLs must arrest falls within 54 Harnesses and connectors selected must be compliant with manufacturer s instructions and must be of compatible size and configuration Snap hooks carabiners and other connectors must be selected and applied in a compatible fashion All risk of disengagement must be eliminated All snap hooks and carabiners must ...

Страница 8: ...Guardian Fall Protection 6305 S 231st St Kent WA 98032 phone 800 466 6385 fax 800 670 7892 www guardianfall com 7 85155 Rev E Labels ...

Отзывы: