34
D
UAL
G
ATE
S
YSTEM
I
NSTALLATION
(8)
3
/
8
”
Serrated Nuts
(2) Quick Release Pins
(2) Chain Master Links
(4)
3
/
8
”-16 x 2” dia.
U-Bolts
(4)
1
/
4
”-20 x
1
/
2
” Screws
(2) Chain Brackets
Operator Housing
32’ Drive Chain
Second Gate Operator
(2) 2” squar
e x 48” long legs
(4)
3/8” -16 x 3
”
Carriage Bolts
(4)
3
/
8
” Nuts
(4)
3
/
8
” Lock
Washers
60’ Power Cable
w/ Strain Relief
Install the second gate operator in the same manner as the Single gate operator starting on page 12 of this
manual. The second gate preparation and wiring of the second (auxiliary) operator follow on the next two
pages. Once the second gate operator is installed, Set the DIP switches for DUAL gates and the order in
which the gates open (“sequencing”). Setting the Control Board for Dual Gate Installations begins on
page 37.
S
ECOND
G
ATE
(A
UXILIARY
) O
PERATOR
P
ARTS
& H
ARDWARE
Battery Cable
Battery
The SL-2200 comes
with a battery and
control box the SL-1200
does not.