![background image](http://html1.mh-extra.com/html/gto/gp-sl100/gp-sl100_owners-manual_2276267012.webp)
9
this unit must only be installed by an experienced technician.
preparation of the gate
Before installing the GTO/PRO slide gate operator, make sure:
• the gate is properly installed.
• the gate is plumb, level, and moves freely.
• the gate does not bind or drag on the ground.
• the gate is screened if necessary
(see page 5.)
• roller guards are installed
(see page 5.)
Installing the Gate Operator
overview of a single gate operator installation
The diagram below is an example of a single slide gate installation with required safety features. The
operator must be installed on the inside of the gate.
You must install safety edges, photo beams and
roller guards
(not included)
to reduce the possibility of bodily injury.
Safety Edges
Safety Edges and Photo Beams
are Required
Roller Guard
Safety Edge
(REQUIRED)
Roller Guard
(REQUIRED)
Safety Edge
Use Rigid Conduit
for inbound AC wire.
Chain Bracket
Chain Bracket
AC POWER
Photo Beams
Chain
Use PVC Conduit
for Receiver
Use PVC Conduit
for Photo Beams
(REQUIRED)
Receiver #RB709U
(NOT INCLUDED)
(REQUIRED)
(REQUIRED)
(REQUIRED)
Operator
Roller Guard
(REQUIRED)
NOTE:
A separate gate or entrance must be installed for pedestrian use.