
GTO 2002XLS Instruction Manual © 01.12.12
15
Connect Operator Power Cables
Bring FIRST and SECOND power cables into the control box
through a strain relief slots, leaving enough wire to reach the
FIRST OPR. and SECOND OPR. terminal blocks.
Insert the individual power cable wires into appropriate terminals
on the FIRST OPR. terminal block (white to WHT; green to GRN;
red to RED; black to BLK). Repeat process for SECOND OPR.
wiring. Tighten the set screws.
Connect the Transformer
(*Solar Instructions on Page 21)
NEVER USE TRANSFORMER AND SOLAR PANEL(S) AT THE SAME TIME!
IMPORTANT INFORMATION ABOUT LOW VOLTAGE WIRE:
• The only wire acceptable for use with GTO products is 16 gauge stranded, low voltage, direct burial
wire. This particular gauge enables the transformer to provide an adequate charge through the control
board to the battery at distances up to 1000'.
• DO NOT use telephone wire or solid wire.
• NEVER SPLICE WIRES. Splicing permits corrosion and seriously degrades the wire's ability to carry an
adequate current.
Step 1
Make sure the power switch is OFF.
Step 2
Select the electrical outlet where you will plug the transformer.
Measure the distance from this outlet to the control box following
the path where the wire will be laid. (Allow for an additional 6” to be pulled into the control box).
Correct
Wrong
Wrong
Wire
Screwed into
wire insulation
Exposed strands
of wire
VAR5
VAR6
K1
PF1
K2
BATT
+
BATT
–
K3
K4
VAR4
VAR3
VAR2
VAR1
MIN
MAX OFF
JP1
REMOVE JUMPER FOR
PUSH TO OPEN OPTION
120
SEC.
G
TO Inc.
Tallahassee, FL
R4722
STALL FORCE
OPEN < JOG > CLOSE
PWR.
SET
LIMIT
1st OPR.
2nd OPR.
STATUS
AUTO CLOSE
SFTY.
EXIT
CYCLE
EDGE
SENSOR
COMMON
LOCK+
LOCK–
WHT
GRN
RED
BLK
WHT
GRN
SECOND OPR
.
FIRST OPR
.
RED
BLK
14 VAC
OR
SOLAR
ON OFF
FIRST Opener
Power Cable
Strain Relief Slots
(Battery Wires Not Shown)
ON/OFF
Switch
ON/OFF
Содержание 2002XLS
Страница 42: ...32 GTO 2002XLS Instruction Manual 01 12 12 Notes...
Страница 43: ...GTO 2002XLS Instruction Manual 01 12 12 33 Notes...