background image

ADICOS GTL-3 - 

Operating manual

Article number: 430-2410-102

Index: EN11

Release date: 29.01.20

– Translation from German –

Manufacturer:

GTE Industrieelektronik GmbH

Helmholtzstr. 21, 38-40

41747 Viersen

GERMANY

Support hotline: +49 2162 3703-0

E-mail: [email protected]

© 2020 GTE Industrieelektronik GmbH – This document and all illustrations contained herein 

are protected by copyright and may not be copied and pasted, modified or distributed with-

out the express consent of the manufacturer!

Technical data is subject to change without notice!

ADICOS® and GSME® are registered trademarks of GTE Industrieelektronik GmbH

Содержание Adicos GTL-3

Страница 1: ...EN GTE Industrieelektronik GmbH Helmholtzstr 21 38 40 41747 Viersen Germany 49 2162 3703 0 info gte de GTL 3 Operation Manual GSME Test Device ...

Страница 2: ...upport hotline 49 2162 3703 0 E mail support adicos gte de 2020 GTE Industrieelektronik GmbH This document and all illustrations contained herein are protected by copyright and may not be copied and pasted modified or distributed with out the express consent of the manufacturer Technical data is subject to change without notice ADICOS and GSME are registered trademarks of GTE Industrieelektronik G...

Страница 3: ...eperate detector units which are connected to a central computer with aid of the M Bus The central unit stores all sensor data required for analysis and it used for the adjustment of alarm and operating parameters The ADICOS GTL 3 test device is used for all ADICOS GSME gas sensor detectors It includes an adapter for the SOLO test system detectortesters com It requires the battery baton as well as...

Страница 4: ... and Spare Parts 6 3 Scope of Delivery 7 4 Structur and Funkction 8 4 1 Overview GTL 3 Test Head 8 4 2 Function 9 5 Preparation for commissioning 10 5 1 Inserting the embers filter 10 5 2 Insert smouldering sticks 11 5 3 Charging the battery bar 11 6 Commissioning the GTL 3 test device 12 6 1 Ignite smouldering sticks 12 6 2 Mounting the test head 13 6 3 Commissioning the fan unit 13 7 Operation 1...

Страница 5: ...tructions are the steps to be taken in order to achieve the previously stated operational objective Instructions appear like this Indicates a single instruction 1 First of a series of instructions 2 Second of a series of instructions 3 etc Intermediate states When it is possible to describe intermediate states or events resulting from the instruction steps e g screens internal function steps etc t...

Страница 6: ...ediately danger ous situation which could lead to death or severe injuries if it is not avoided 1 3 Abbreviations The following abbreviations are used through this manual Abbr Meaning ADICOS Advanced Discovery System GSME GSME fire gas detector SOLO Testing system of the company No Climb Products Ltd for fire detectors GTL 3 GSME Tester 1 4 Storing this Manual Store this manual near the detectors ...

Страница 7: ...be observed Any other use requires prior consultation with the manufacturer Intended use also includes following the instructions in this manual and complying with all relevant local regulations 2 2 Standards and Regulations When testing ADICOS detectors the safety and accident prevention regulations valid for the specific application must be observed The following standards and guidelines are als...

Страница 8: ...are only allowed by qualified personnel 2 4 Modification WARNING Any form of unauthorized modification or expansion is expressly prohibited and may result in serious injury or damage by fire or explosion A modification of the GTL 3 is expressly prohibited 2 5 Accessories and Spare Parts WARNING The use of parts other than the manufacturer s original spare parts and acces sories can cause serious i...

Страница 9: ...EN11 Scope of Delivery 3 Scope of Delivery Quan tity Description 1 Transport case 1 GTL 3 housing with gas funnel 1 GTL 3 fan unit 1 Protection tube 28 GTL 3 smouldering sticks in tin can 30 GTL 3 glow filter in tin can 1 Lighter ...

Страница 10: ...Structure and Function 8 ADICOS GTL 3 430 2410 102 EN11 4 Structure and Function 4 1 Overview GTL 3 Test Head 5 6 7 8 4 2 1 3 9 ...

Страница 11: ...o the detectors in a controlled manner with aid of an electronic fan If the gas funnel of the GTL 3 is put on top of the ADICOS GSME the air flow generated by the fan unit drives the gases released inside the combustion chamber to the sensors and triggers an alarm Before entering the installation to test detec tors the smouldering rod is ignited and placed inside the combustion chamber Then the fa...

Страница 12: ... the escape of embers and hot ashes during operation As soon as the filter is polluted and clogged with fire deposits it must be replaced before next operation Tips and recommendations A clogged glow filter blocks the proper emission of test gases and therefore leads to incorrect test results Insert replace embers filter 1 Press the gas funnel downwards pull the em bers filter holder upwards 2 Rem...

Страница 13: ...vice 2 Unscrew knurled nut 3 Dispose any residual combustibles material and ashes safely and properly 4 Insert new smoke stick in the holder and fasten with knurled nut 5 Carefully tighten the knurled nut to Smoulder ing sticks cannot be damaged 6 Close device 7 For this purpose place the GTL 3 housing straight on the lower part 5 3 Charging the battery bar Tips and recommendations Before each use...

Страница 14: ... generated Do not inhale vapours Tips and recommendations Before starting up the ADICOS GTL 3 make sure that The batteries of the SOLO battery bar are sufficiently charged A new smouldering rod in the holder GTL 3 smouldering rod is inserted and screwed together The fan unit is firmly screwed to the GTL 3 housing A new embers filter is inserted into the GTL 3 gas funnel and properly clamped 6 1 Ig...

Страница 15: ...and the operating switch is pressed Mounting the battery pole 1 Insert the SOLO battery pole into the fan unit with the connection socket first Note the hole for the locking button 2 Press down the locking button and push the bar fur ther until it stops 3 The fan unit is placed in a proper position as soon as it locks with an audible click of the button 4 Slide the switch in the ON direction 5 The...

Страница 16: ...is essential to extinguish the GTL 3 smouldering sticks and switch off the fan Chap 7 2 Set fan unit out of operation 7 2 Set fan unit out of operation Slide the operating switch in direction OFF NOTICE The GTL 3 smouldering rod can cause fires if left unattended Always extinguish GTL 3 smouldering sticks after the last test Delete GTL 3 smouldering sticks 1 Open the device 2 Loosen knurled nut 3 ...

Страница 17: ...unit 8 Maintenance 8 1 Cleaning Clean test head Clean the metal surfaces of the probe and the inside of the protection tube with a damp cloth after operation Use a soft brush if necessary GTL 3 Clean housing If necessary clean the outer surfaces of the GTL 3 housing with a damp cloth NOTICE Abrasive cleaning agents can damage the surface of the GTL 3 probe Do not use aggressive cleaning agents 2 1...

Страница 18: ...ge Store the device in the transport case when not in use NOTICE This device is operated by means of controlled combustion which can lead to fires without initiated extinguishing Only insert the device into the case when the smolderinmg rod is extin guished ...

Страница 19: ...cturer guarantees that all com ponents will be disposed of in an environmentally friendly manner 10 Technical Data General information Dimensions mm 430 x 90 L x Ø Weight kg 0 58 Electrical characteristics Power consumption mA 250 Input voltage V 7 2 Environmental conditions Temperature range C 10 45 Humidity range 95 non condensing ...

Отзывы: