13
ADICOS GTL-3
430-2410-102 EN11
coMMissioning the gtl-3 test Device
6.2 Mounting the test head
1
Plug the GTL-3 housing straight onto the fan unit,
using the threaded hole for the knurled screw
2
Secure assembled housing parts with knurled screw
6.3 Commissioning the fan unit
The fan unit of the ADICOS GTL-3 starts working as soon as it is connected to the SOLO bat-
tery bar and the operating switch is pressed.
Mounting the battery pole
1
Insert the SOLO battery pole into the fan unit with
the connection socket first. Note the hole for the
locking button
2
Press down the locking button and push the bar fur-
ther until it stops
3
The fan unit is placed in a proper position as soon as
it locks with an audible click of the button
4
Slide the switch in the ‘ON’ direction
5
The fan starts rotating.
6
The GTL-3 is now ready for use.
Tips and recommendations
During operation, the fan must run permanently so that the GTL-3 smouldering
rod does not go out.
1
2
3