PNEG-1820CE
CE Compliant Top Dry Series 2000 Autoflow
33
13. Start-Up Procedure
Initial Dryer Start-Up
1. With Control Power switch OFF, turn ON the main power supply.
2. Pull out all Emergency Stop switches.
3. Set the switches as follows:
•
Moisture Control switch - “ON”
•
Aeration Fan switch - “AUTO”
•
Load Auger switch - “OFF”
•
Fan switch - “AUTO”
•
Heater switch - “AUTO”
•
Dump switch - “AUTO”
•
Dry and Hold switch - “OFF”
4. Make sure there is wet grain in the wet supply tank.
5. Turn control power “ON” position.
6. The screen will display a copyright message and software version number.
7. The screen should read “STOPPED”. The chamber high level and the chamber low level should both
read “NO”.
8. Set the dry timer using the drying charts for the specific bin size, fan and heater size, drying
temperature and grain input moisture content.
9. Set the dump timer as follows:
•
18' Diameter bin = 30 Seconds
•
21' Diameter bin = 33 Seconds
•
24' Diameter bin = 36 Seconds
•
27' Diameter bin = 39 Seconds
•
30' Diameter bin = 42 Seconds
•
36' Diameter bin = 36 Seconds
10. Set all other delays and timers as prescribed in the electronic monitoring control section
of this manual.
11. Press the Reset button for timer changes to take effect immediately.